On this page
2.3 Preparatory Phase and Preparation of Graphics
Regardless of the type of graph you are going to use, you need to carry out a series of preparatory steps for its application:
- Awareness and training of people involved in the process.
- Correct process definition (process mapping).
- Analysis to choose the most significant quality characteristics, focusing on the customer. The application of the Pareto chart can be very useful at this stage.
- Definition and analysis of the measurement system (units, instruments, degree of precision of measurements, method for taking measurements, etc.).
- Choosing the phase of the process where the records will be made in order to obtain information that allows, in the event that special causes are detected, their immediate and effective correction to avoid defective items.
Once the preparatory phase has been carried out, the creation of the graphics must follow the following steps:
- Choosing the type of graph;
- Data collection;
- Indication of the state of the process and its performance;
- Determination of process capacity, after reaching the control state;
- Actions to improve the process.
The following topics describe each of the above items.
-
Choosing the chart type
In principle, the graphic type to be selected depends on the quality characteristic to be controlled. Since this is a continuous characteristic (weight, size, concentration, etc.) the graphs for individual values or the $ \overline{X} $ and $ R $ (or $ \overline{X} $ and $ S $) can be used. Often go/no-go instruments are used, which produces a discretization of continuous characteristics, thus allowing the use of p (or np) graphs.
-
Data collection - rational subgroups
To collect data, it is necessary to choose the size of each sample and the sampling frequency, also called rational subgroup, as well as the number of rational subgroups. When sampling, it is essential to choose samples that represent subgroups of items that are the most possible homogeneous, aiming to exalt differences between groups.
“It is very important when applying control charts to carefully choose rational subgroups.”
Some considerations regarding the size of subgroups for graphs $ \overline{X} $ and $ R $ or $ \overline{X} $ and $ S $ are:
- Subgroups should be as small as possible so that their averages do not mask changes.
- Subgroups of size 4 or 5 detect changes in the process more quickly than larger subgroups.
- Subgroups of 4 or 5 items are optimal (or nearly so) if the special causes produce changes of 2 (2 sigma) or more in the overall process level. If the changes are small (1 or less), it will be necessary to choose larger subgroups (of 15 or 20 items) to detect them. Application of tools such as CUSUM provide analysis of small variations.
Often, in order to properly determine the rational subgroups, we can use the cause and effect diagram or even the process FMEA.
-
Choice of control limits
The choice of control limits is a decision to be made based, essentially, on economic criteria. The use of 3σ (3 sigma) limits is quite widespread, but there are situations where it is necessary to apply other criteria.
-
Calculation of center line and control limits
The calculation of control limits and center line will be considered on a case-by-case basis, for each type of graph and its possible variants.
-
Process status indication
When data is recorded and compared to control limits, points outside (inside) these limits will indicate that the process is statistically “out of control” (“in control”). After actions (usually local) have been taken, more observations are collected and, if necessary, the limits are recalculated to study the presence of other possible special causes of variation.
-
Determination of process capability
Control limits are not specification limits, but they reflect the natural variability of the process, functioning only as indicators of special causes of variation. After the special causes are eliminated the process capacity can be evaluated.
In Figure 3.1 we exemplify the control limits and the central line for the graph $ \overline{X} $.
Figure 2.3.1: Control limits and center line for the graph $ \overline{X} $.
2.3.1 Planning for implementing the CEP
Initially, we argue that the CEP only has a chance of being properly implemented in an environment where barriers and paradigms are easily broken, where there is effective management commitment, the importance of customers is recognized and other aspects that are fundamental to the implementation of a work methodology are also highlighted. In general, the proposed steps are:
Step 1
Obtain commitment from senior management
- Obtain effective commitment from senior management;
- Form a committee of managers responsible for the program.
Responsible: Production, Product Engineering, Process Engineering, Quality.
Tools: Presentation by external consultants and management seminars.
Step 2
Formulate a policy (guidelines)
- Appoint a “facilitator” and an “improvement team”;
- The committee, together with the facilitator, must establish a general plan that encompasses the main guidelines of the CEP program:
- general objectives;
- managerial responsibilities;
- the training strategy;
- the resources necessary to execute the program;
- financial needs;
- timeline.
Responsible: Committee
Tools: Work meetings.
Step 3
Establish facilitator and improvement team responsibilities
- The facilitator’s main role is to establish, develop and monitor the CEP program;
- Depending on the size of the organization, it may be necessary to appoint more than one facilitator.
- One of the facilitator’s main responsibilities is to be a trainer, to provide support to the areas that propose to implement the CEP.
- Main characteristics or skills that the facilitator must have: good communication, skills in practical statistical analysis, adequate relationships with the factory floor, have the trust of all levels of the organization and be an enthusiast of the CEP.
- The Improvement Team must be composed of representatives from 5 areas: engineering, management, production, manufacturing, and quality control.
- The Improvement Team’s main responsibility is to participate in meetings and brainstorming sessions to search for and eliminate special causes of variation.
Responsible: Committee
Tools: Work meetings.
Step 4
Define a training strategy
- Some questions help define the strategy:
- How many people need to be trained?
- What different types of courses need to be developed?
- Who will do the training?
- How many people will be trained?
- Will the training be carried out outside or inside the company?
Responsible: Committee and facilitator
Tools: Work meetings.
Step 5
Train managers and supervisors
- After defining the training strategy, it is important to carry it out initially with managers and then with supervisors.
- It is important that training is complemented with a practical activity.
Responsible: Committee
Tools: Presentation by external consultants and management seminars.
Step 6
Inform operators
- Declare to operators that the CEP will be implemented.
- It is important to remember that this communication activity does not yet involve training.
Responsible: Director, general manager.
Tools: Presentation techniques, videos.
Step 7
Involve suppliers
- The improvements to be obtained with the implementation of the CEP will most likely depend on the participation of suppliers.
- Process improvement can sometimes directly depend on improving the quality of the raw material.
Responsible: Committee
Tools: Management seminars, training, etc.
Step 8
Choice of quality characteristics for the application of the CEP.
- To choose the quality characteristics that will be evaluated by the CEP, we suggest the following points:
- Analysis of customer needs
- Specifications and drawings provided by the customer
- Applied regulations (Legislations)
- FMEA’s
- Test results
- Lessons learned from the past
- When using FMEA’s we suggest the following criteria:
- D-FMEA detects “potential” quality characteristics to be evaluated when:
- S = 10 or 9 (S = Severity)
- S = 8 and if Occurrence is strictly greater than 1
- P-FMEA transforms “potential” quality characteristics into “confirmed” characteristics when:
- S = 10 or 9
- S = 8 and if Occurrence is strictly greater than 4
- D-FMEA detects “potential” quality characteristics to be evaluated when:
- Apply MSA to the chosen characteristics.
Responsible: Managers, technicians and facilitator.
Tools: FMEA, MSA, Pareto Chart.
Step 9
Collect data (PHASE 1 of the Improvement Model)
- Choose the type of graph to be applied
- Define the rational subgroup
- Collect data: involve different production batches
- Create the first graphs: assess stability
- Assess process capacity/performance
- Suggested rules for CEP administration:
- Create a list of characteristics that are being monitored with the CEP
- Eliminate the CEP of characteristics that have Pp ≥ 2 and Ppk ≥ 1.5.
- Decrease sampling frequency for characteristics that have Pp ≥ 1.5 and Ppk ≥ 1.33.
- Maintain (and even increase) sampling frequency for features that do not perform well.
- Answer the questions:
- Is the system stable? (yes or no)
- Is the system capable? (yes or no)
Possible combinations are:
| Is it stable? | Are you capable? | Step |
|---|---|---|
| yes | yes | 12 |
| yes | no | 11 |
| no | yes | 12 |
| no | no | 10 |
Table 2.3.1: Possible system combinations
- Check the combinations and follow the step (take a path).
Responsible: Facilitator, Technicians and Improvement Team.
Tools: Control Charts, Cp, Cpk, Pp, Ppk.
Step 10
Detection of special causes and actions on the process.
- Remove out-of-control points from the data collection phase and recalculate the control limits;
- Prepare the CEP letter with the established limits;
- Define the signs of lack of control;
- Define who is responsible for the CEP letter in each production shift;
- Define the appropriate logbook for the process under analysis;
- Train those involved in improving the process;
- Restart data collection;
- Stabilize the process with improvement actions;
- Assess process capability.
- Go to Step 9.
Responsible: Manufacturing, Facilitator, Technicians and Improvement Team.
Tools: Control Charts, Cp, Cpk, Pp, Ppk.
Step 11
Process Improvement
- Maintain the CEP to monitor the process;
- Application of Six Sigma techniques to improve processes:
- Identification of common causes of variation;
- Reduction of common causes of variation;
- DOE application.
- Go to Step 9.
Responsible: Manufacturing, Facilitator, Technicians and Improvement Team.
Tools: Control Charts, Cp, Cpk, Pp, Ppk.
Step 12
Process Monitoring
- Prepare the lighthouse graphic
- Assess process capability.
- Go to Step 9.
Responsible: Manufacturing, Facilitator, Technicians and Improvement Team.
Tools: Control Charts, Cp, Cpk, Pp, Ppk.