2.8 Pre-Control Charts
Control charts $ \overline{X} $ and R, mean and amplitude, essentially serve to analyze the nature of variability in processes and to diagnose the causes that lead to the “Out of Control” state. In turn, techniques called Pre-Control (P.C.) aim to detect changes in the level or dispersion of the process that lead to the manufacture of defective or out-of-specification products.
Pre-Control was initially designed with the intention of being, at the same time, a simplification and improvement of classic CEP cards.
Developed in the 1950s, it allows evaluating whether the parts produced are within specification and gives an alarm when there is a tendency to produce non-conforming parts. It has nothing to do with process stability, but it has a certain relationship with the process capacity, that is, even if the process is unstable, but is producing parts within tolerance (according to the Pre-Control rules) no alarm will be given. If the process is not capable, Pre-Control will do nothing to change this situation.
Justification of the pre-control chart
Let us now consider a centered process whose variable is (approximately) normally distributed and whose natural limits ($ \overline{X} \pm 3s $), coincide with the specification limits of the characteristic of interest.
We have to:
$ \overline{X} = \dfrac{1}{n}\sum_{i=1}^{n}X_i $
$ s^2 = \dfrac{1}{n - 1}\sum_{i=1}^{n}\left(X_i - \overline{X}\right)^2 $
in which $ \overline{X} $ is the average and $ \sqrt{s^2} $ is the standard deviation of a sample of size n.
For a process under these conditions it appears that:
$ CP = \dfrac{\hbox{Tolerância Natural}}{6s} = 1 $
To implement the P.C. Pre-Control limits must be established; These limits will be equidistant between $ \overline{X} $ (process average) and specification limits, thus dividing the tolerance range into regions, as shown in Figure 8.1.
Figure 2.8.1: Limits of the Pre-Control graph.
We consider:
- LIE = Lower specification limit;
- LIPC = Lower pre-control limit;
- LSPC = Upper pre-control limit;
- LSE = Upper specification limit.
The region between the P.C. limits covers half of the tolerance interval, and is called the target or nominal area. In Figure 8.2 this area is represented by the green region, which is equivalent to approximately 86% of the observations.
Figure 2.8.2: Pre-Control graph bands.
It can also be observed that under the conditions of our hypotheses - normal, centered process and capacity 1 - the probability of an observation having values outside one of the P.C. lines is approximately 14%.
As a consequence, when two consecutive items fall outside the same P.C. limit, it is most likely that the process has changed level. In this case, it is recommended to readjust the process to its nominal level.
On the other hand, if one item falls outside the P.C. limits and the next item falls outside the other limit, it is more likely that a change in dispersion has occurred in the process, perhaps caused by the introduction of some undesirable factor. In these circumstances, process operators must take measures to immediately correct the process.
We will describe below the steps for classic Pre-Control.
2.8.1 Rules for operating with the Pre-Control technique
-
Divide the specification range into regions as shown in Figure 8.1.1;
-
Start work;
-
Whenever a part falls outside the specification limits (is in the red region), as shown in Figure 2.8.3, readjust the process;
Figure 2.8.3: Reset the process.
- If a part falls within specifications but outside one of the P.C. limits (yellow region), as shown in Figure 2.8.4, check the next part;
Figure 2.8.4: Check the next item.
- If the next part was also outside the same PC limit, readjust the process, as shown in Figure 2.8.5;
Figure 2.8.5: Reset the process.
- If after step 4 (Figure 2.8.4) the next piece is within the P.C. limits, continue with the work and readjust only in the case where two successive pieces are outside the same P.C. limit;
Figure 2.8.6: Continue the process.
- If two successive pieces appear on both sides of the PC limits (in both yellow regions), as shown in Figure 2.8.7, the process must be immediately corrected to reduce their dispersion;
Figure 2.8.7: Reset the process.
- If 5 successive values fall within the P.C. limits (green region), as shown in Figure 2.8.8, start sampling with the usual frequency (regular sampling). While waiting for 5 consecutive pieces in the green region, each time a piece comes out of that region, the count starts again;
Figure 2.8.8: Increase the spacing between sampled items.
-
When the process is under regular sampling, do not interfere with it until a part is in the yellow region. In this case, observe the next part and proceed as in step 6 (Figure 2.8.6);
-
After each readjustment, 5 consecutive pieces must be observed presenting values within the PC limits before proceeding to regular sampling;
-
If the operator records 25 samples without having to readjust the process, see Figure 2.8.9, the regular sampling frequency can be decreased allowing more parts to be manufactured between each observed sample. If on the contrary, the operator must readjust the process before 25 samples are observed, see Figures 2.8.10, 2.8.11, 2.8.12, 2.8.13, and the observation frequency will be increased. An average of 25 samples observed between readjustments is an indicator that the regular sampling frequency is correct.
Figure 2.8.9: Process under control - continue.
Figure 2.8.10: Reset the process.
Figure 2.8.11: Reset the process.
Figure 2.8.12: Reset the process.
Figure 2.8.13: Reset the process.
2.8.2 2-stage Pre-Control
Classic Pre-Control refers to the original formulation, while 2-stage Pre-Control is a modification that improves the operational characteristics of the method by collecting an additional sample if the initial sample provides ambiguous results.
Modified Pre-Control, on the other hand, represents a departure from the philosophy adopted in the other 2 types, it attempts to achieve a compromise between the philosophy of control charts and the simplicity of application of Pre-Control.
For both versions, the process passes qualification (set-up) if 5 consecutive units are observed in the green zone.
The substantial difference between them is in the group classification method. The first version is based on engineering tolerance or specification limits, while Modified Pre-Control classifies units using control limits as on control charts.
It has been suggested that Classical and 2-Stage Pre-Control are only applicable if the actual process dispersion (6 process standard deviations) covers less than 88% of the tolerance band.
With specification limits a ± 1, this condition corresponds to the constraint σ < 0,2933, ou seja,
σ < 0,1467 × Tolerância, ou ainda (6 × σ < 88% da Tolerância).
A diferença importante é o critério de decisão.
Para o Pré-Controle de 2 Estágios, amostrando-se 2 unidades, temos:
- Se qualquer peça cair dentro da região vermelha, conforme Figura 2.8.14, parar e ajustar.
Figure 2.8.14: Reset the process.
- If both pieces fall within the green region, as shown in Figure 2.8.15, continue the operation.
Figure 2.8.15: Process under control - continue.
- If any piece (or both) are in the yellow region, continue to sample 3 more pieces, up to a maximum of 5. Continue the operation if the combined sample contains 3 pieces in the green region and stop when there are 3 pieces in the yellow region, or even, if we observe a piece in the red region, see Figures (2.8.16, 2.8.17, 2.8.18, 2.8.19, 2.8.20, 2.8.21, 2.8.22, 2.8.23).
Figure 2.8.16: Continue to sample 3 more pieces.
Figure 2.8.17: Continue to sample 3 more pieces.
Figure 2.8.18: Continue the process.
Figure 2.8.19: Continue the process.
Figure 2.8.20: Reset the process.
Figure 2.8.21: Reset the process.
Figure 2.8.22: Reset the process.
Figure 2.8.23: Reset the process.
2.8.3 Important observations about the Pre-Control graphs
- Recommended in processes with high capacity (e.g. Cpk > 1.67 - long term) and can also be used in processes with good capacity (e.g. Cpk > 1.33 - long term);
- Applicable in situations where there is no control over the measured characteristic (it is not easy to take action on the system) or where there is no concern about it (regardless of the result obtained, the quality of the product is not affected);
- Not recommended in non-capable processes (e.g. Cpk < 1,33 - longo prazo) pois poderá provocar “tampering” ou “over-control” (reajuste excessivo do processo aumentando ainda mais a dispersão);
- Não recomendável para processos instáveis, pois não identifica se a causa de variação é comum ou especial, o que pode gerar ações equivocadas, custos desnecessários e descrença.
Vantagens:
- Bastante simples, treinamento quase desnecessário
- Baixo custo operacional
- Comparação direta com a tolerância especificada para o produto
- Incorpora procedimento de verificação de set-up
Desvantagens:
- Não indica condições de instabilidade do processo
- Não separa causas comuns de causas especiais, podendo gerar ações incorretas e custos decorrentes
- Inadequado para estabilizar um processo
- Se utilizado em processos não capazes pode piorar ainda mais o desempenho dos mesmos
Processos estáveis porém incapazes
O procedimento de set-up de aprovação do gráfico de Pré-Controle denomina um processo capaz se cada uma das 5 observações consecutivas “caírem” na região verde. Dessa forma, para um dado Cp podemos calcular a probabilidade que o processo é aceito como capaz.
$ \hbox{Pr[aceitar capacidade]} = {\hbox{Pr}[\mid X \mid \leq 1]}^5 = {\hbox{Pr}[\mid Z \mid \leq (1,5)C_p]}^5 $
A Tabela 2.8.1 mostra a probabilidade de aceitarmos um processo como capaz em função dos valores de Cp.
| Cp | ||||||
|---|---|---|---|---|---|---|
| 0,5 | 0,75 | 1 | 1,5 | 2 | 2,5 | |
| P(aceitar) | 0,0489 | 0,221 | 0,4882 | 0,8836 | 0,9886 | 0,9928 |
| P(rejeitar) | 0,9511 | 0,779 | 0,5118 | 0,1164 | 0,0134 | 0,0072 |
Table 2.8.1: Table of Cp’s
We observe in Table 2.8.24 that when taking 5 consecutive samples, the probability of incorrectly classifying a process with high capacity (Cp = 2.0) as being a process with low capacity is less than 1.34%. However, the probability of classifying processes with low capacity as good is very high, as is the case of a process with capacity equal to 1, as the acceptance probability of 48.82% is very close to the rejection probability, which is equal to 51.18%.
The advantage lies in the greater amount of information about the status of the process, so decision errors are less likely.
The objective of Modified Pre-Control is to detect stability deviations. It requires estimation of current process parameters to determine control limits.
For the Pre-Control graph to be under control we have:
- All points between the pre-control lines (green area), as shown in Figure 2.8.24.
Figure 2.8.24: Pre-control graph - under control.
- Only one point between the specification limits and the pre-control limits (yellow area), as shown in Figure 2.8.25.
Figure 2.8.25: Pre-control graph - under control.
For the Pre-Control graph to be out of control we have:
- Any point outside the specification limits (red area), as shown in Figure 2.8.26.
Figure 2.8.26: Pre-control graph - out of control.
- Two consecutive points beyond the pre-control lines:
- same yellow area
- opposite yellow areas
See Figure 2.8.27.
Figure 2.8.27: Pre-control graph - out of control.
- Pre-Control was developed as an alternative to control charts for small batch manufacturing.
- Pre-Control, as originally conceived, is product (not process) oriented, it qualifies the process and keeps its output within specifications.
- The Pre-Control paradigm can be modified to process limits instead of specification limits. This allows the tool’s virtues to be applied to processes that have initially been qualified in a state of statistical control.
- Use the process values of ± 3σ as limits (transition from yellow to red zones) and then use ± 1.5σ as alert limits (transition from green to yellow zones).
Using a sample size of 5, the decision rules become:
Step 1: inspect 2 pieces
- If both are in green, continue the process
- If 1 or both are in the red, implement a reaction plan and restart step 1
- If 1 or both are yellow, go to step 2.
Step 2: inspect 3 more pieces
- If any of them are in the red, implement a reaction plan and restart step 1
- If 3/5 are in yellow, implement a reaction plan and restart step 1
- If 3/5 are in the green, continue.
When modifying Pre-Control for process limits its great weakness is removed, however, its virtues remain. The Modified Pre-Control is another statistical tool for our consideration.
Ford states in Q-101 that there are certain statistical methods that are counter-productive to the philosophy of continuous improvement, including Pre-Control; these methods are not evidence of continuous improvement.