Capability Analysis 3 of 11
On this page

Capability Analysis

3.2 Process Capacity and Performance Indexes for Normal Data

Chapter 2 of 10 17 min read

Initially, let’s consider the case where the normal distribution fits the data well. In this case, the amplitude of 99.73% corresponds to the value of 6σ (or its estimate 6$\hat{\sigma}$), in which $\sigma$ it is associated with short-term variability for capacity and long-term variability for performance. Next, we analyze the capacity and performance indices for the normal distribution.

3.2.1 Process capacity indices: $C_p$ and $C_{pk}$

In this section, we will present the process capability index under the assumption of data normality. For a process under statistical (stable) control, the capability index determines what can be expected for the process in relation to specifications. As we presented in the introductory section, process capability indices can only be established for a process that is stable over time (under control). The index $C_p$ is defined when the data follows a normal distribution, for

$$C_p = \dfrac{\hbox{Variabilidade Permitida do Processo}}{\hbox{Variabilidade Inerente}}$$

i.e.

$$C_p = \dfrac{LSE - LIE}{6\sigma}$$

where LSE is the Upper Specification Limit and $LIE$ the Lower Specification Limit.

Figura3.2.1

Figure 3.2.1: Process Capability Index $C_p$

A centered process, that is, $μ = (1/2)(LIE + LSE)$ with a normal (stable) distribution and with a $C_p$ = 1 will produce 0.27% of items out of specification. Also, for a centered and stable process with $C_p$ = 1, the control limits for the mean and specification graph are related as follows

$$LSC = \dfrac{LSE}{\sqrt{n}} ~~~~~ {e} ~~~~~ LIC = \dfrac{LIE}{\sqrt{n}},$$

where n is the size of the rational subgroups in the control chart. We thus have that, unless the constant $\sqrt{n}$, the two limits coincide for processes with $C_p$ = 1. The index $C_p$ is a measure of process capability and can be estimated by

$$\widehat{C}_p = \dfrac{LSE - LIE}{6\widehat{\sigma}},$$

in which $\widehat{\sigma}$ it is an estimate of the short-term variability of the process. Most companies embrace value $C_p = 1,67$ (or $C_p = 1,33$) as recommended by Juran and Gryna (1980). An index used, equivalent to the $C_p$, is the “Capacity Ratio” $R_c$ which is defined as the reciprocal of $C_p$. In percentage the $R_c$ is given by:

  • $R_c$ = $\char37$ the specification used;

  • $R_c$ = $[6σ/(LSE - LIE)]×100 \char37$ ;

  • $R_c$ = $(1/C_p)×100 \char37$;

For $C_p = 1,33$ (normal data, process under control and centered) we have a corresponding value of $R_c = 75 \char37$. Likewise, a $R_c=60 \char37$ is related to a $C_p=1,67$. The smaller the $R_c$ of a process that improves its behavior.

Figura3.2.2

Figure 3.2.2: Distribution behavior with $C_p$ in different values

To more efficiently evaluate process capacity, the index was introduced in Japan. $C_{pk}$, which takes into account not only the variability of the process but also its location with respect to specification limits. Before we get into the index analysis $C_{pk}$ let us consider two other indices, which together with $C_p$ and $C_{pk}$ reveal different aspects of the process. For the upper specification we define

$$C_{pS} = \dfrac{LSE - \mu}{3\sigma} = \dfrac{LSE - \mu}{\dfrac{\hbox{variabilidade inerente}}{2}}.$$

Similarly, for the lower specification we take

$$C_{pI} = \dfrac{\mu - LIE}{3\sigma},$$

where μ is the process average. The relationship between $C_p$ and the double ($C_{pI}$, $C_{pS}$) is given by

$$C_p = \dfrac{C_{pI} + C_{pS}}{2}.$$

In this way, we define the index $C_{pk}$ by:

$C_{pk}$ = minimum between $C_{pI}$ and $C_{pS} = min \lbrace C_{pI}, C_{pS} \rbrace$

In the case of bilateral specifications, the index $C_{pk}$ allows assessment of process capability in the “worst case scenario”. In this sense, the use of $C_{pk}$ determines the “most conservative” strategy. Thus, a process with $C_{pk}$ high offers guarantees of satisfactory behavior, as long as stability is maintained. The relationship between $C_p$ and $C_{pk}$ is defined by

$$C_{pk} = C_p(1-k),$$

where k is the factor that represents how centered the process is

$$k = \dfrac{\mid m - \mu \mid}{(LSE - LIE)/2},$$

being $m = (LSE - LIE)/2$ the central point of the specification. We present the capacity indices in Figure 3.2.3.

Figura 3.2.3

Figure 3.2.3: Process capability indices.

Standard deviation estimation

Below we will present several methods to estimate the short-term standard deviation, which is used to calculate the Process Capability index.

Short-term variability

Method 1

Traditionally, when estimating variability on a graph $\overline{X}$ and R we have

$$\widehat{\sigma} = \dfrac{\overline{R}}{d_2},$$

in which $\overline{R}$ is the average of the amplitudes of the subgroups and the constant $d_2$ is tabulated in the Appendix.

Some practical situations are analyzed below:

  • Observation 1: When data is taken sequentially (over time) and stability is assessed via a graph $\overline{X}$ and R, the traditional estimate ($\overline{R}/d_2$) is not influenced by the variability occurring between subgroups. Therefore, we admit that the process is under control.

  • Observation 2: When we take a sample from a population (which is not carried out over time), the sample standard deviation ($s$) is the only way to estimate variability. Furthermore, the capacity index is not applicable.

Method 2

Another way to estimate short-term variability is defined by

$$\widehat{\sigma} = \dfrac{\overline{s}}{c_4}, \quad {ou} \quad \overline{s}$$

in which $\overline{s}$ is the mean of the sample standard deviations of the subgroups and $c_4$ a constant tabulated in the Appendix. This strategy is applied when we take sequential samples (over time) and evaluate stability via the mean and standard deviation graph. The addiction correction constant $(c_4)$ can be applied to correct standard deviation. Below we present the formula for the constant $c_4$ and in the section “Property of Estimators” this formula is derived.

Method 3: Pooled Standard Deviation

Another method used to estimate short-term variability. It is used when samples have subgroups of variable sizes, being defined by

$$\widehat{\sigma} = s_p$$

where sp represents the Spooled standard deviation and is given by

$$s_p = \sqrt{\dfrac{\displaystyle\sum_{i=1}^{m}\sum_{j=1}^{n_i}(x_{ij}-\overline{x}_i)^2}{\displaystyle\sum_{i=1}^{m}(n_i-1)}}$$

being

$$\overline{x}_i = \sum_{j=1}^{n_i}\dfrac{x_{ij}}{n_i}$$

We can also use a correction factor c4(d) in order to reduce bias in the estimate, with this we have

$$\widehat{\sigma} = \dfrac{s_p}{c_{4}(d)}$$

in which

$$d = \left(\sum_{i=1}^{m}n_i \right) - m + 1$$

The values of $c4(d)$ can be determined through the relationship

$$c_4(d) = \sqrt{\dfrac{2}{d-1}}\left(\dfrac{\Gamma(d/2)}{\Gamma((d-1)/2)} \right)$$

being $\Gamma(\cdot)$ the gamma function.

Below we present an example involving the concepts discussed.

Example 2.1.1

Let us consider a process under control whose data follows a normal distribution. For this process we have the following specifications:

Let’s assume that the sample mean of the process is given by $\overline{x}$ = 10.662 and $\overline{R}$ = 0.2, for a sample with 3 elements in each subgroup.

Let’s calculate the process capacity as discussed above. First, the standard deviation is calculated

$$\widehat{\sigma} = \dfrac{\overline{R}}{d_2} = \dfrac{0,2}{1,693} = 0,118$$

in which $d_2 = 1,693$ (for $n = 3$) tabulated in the Appendix.

The worst situation (the one in which the process generates the highest percentage of defects) is evaluated by the $C_{pk}$, that is,

$$C_{pS} = \dfrac{LSE - \mu}{3\widehat{\sigma}} = \dfrac{10,9 - 10,662}{3 \ast 0,118} = 0,67$$

$$C_{pI} = \dfrac{\mu - LIE}{3\widehat{\sigma}} = \dfrac{10,662 - 10,5}{3 \ast 0,118} = 0,46$$

So,

$$C_{pk} = \min\lbrace C_{pI}, C_{pS} \rbrace = \min\lbrace0,46; ~0,67\rbrace = 0,46.$$

Handling one-sided tolerances

In some cases, we only have engineering upper or lower limits. Therefore, we cannot calculate the index $C_p$. In these cases, the CEP manual 2nd Edition (ISOTS 9000) proposes the following strategy:

  • Upper limit only

    • $C_{pk}$ = $C_{pS}$;

    • $C_p$ does not apply;

    • $C_{pI}$ does not apply.

  • Lower limit only

    • $C_{pk} = C_{pI}$;

    • $C_p$ does not apply;

    • $C_{pS}$ does not apply.

Example 2.1.2

Consider a batch process in which we perform three measurements per batch, beginning, middle and end of each batch. The specifications are given by $LSE=12$ and $LIE=9$. We will evaluate the capacity and performance of the process.

Lot Measurements
1 10,69 10,80 10,39
2 10,20 10,30 10,72
3 10,42 10,61 10,54
4 10,98 10,27 10,50
5 10,61 10,52 10,67
6 10,57 10,46 10,50
7 10,44 10,29 9,86
8 10,20 10,29 10,41
9 10,46 10,76 10,74
10 10,11 10,33 10,98
11 10,29 10,57 10,65
12 10,83 11,00 10,65
13 10,35 10,07 10,48
14 10,69 10,54 10,61
15 10,44 10,44 10,57
16 10,63 9,86 10,54
17 10,54 10,82 10,48
18 10,50 10,61 10,54
19 10,29 10,79 10,74
20 10,57 10,44 10,52

Table 3.2.1: Measurements per batch (start, middle and end)

First, let’s do a stability analysis of the process using a control chart:

Figura 3.2.4

Figure 3.2.4: Process Performance Analysis

Figura 3.2.5

Figure 3.2.5: X-Bar Chart

Figura 3.2.6

Figure 3.2.6: Amplitude Graph

The X-Bar graph with all values within 3 standard deviations of the central limit indicates that the process is stable. The amplitude graph indicates that all values ​​are within the control limit.

Next, we will check whether the data has a normal distribution:

Normal(mu = 10.51, sigma = 0.24) Statistics P-Value
Anderson-Darling 0.4777 0.2284
Cramer-von-Misés 0.0747 0.2382
Kolmogorov-Smirnov 0.0977 0.1651

Table 3.2.2: Normality Test

As all p-values associated with the tests are greater than 0.05, we do not reject the hypothesis that the data has an approximately normal distribution.

With this, we can analyze the capacity of the process. For this process we have the following specifications:

$LIE = 9$ and $LSE = 12$

We then calculate the sample mean of the process: $\overline{x}$ = 10.51 and the average of the subgroup amplitudes $\overline{R}$ = 0.365, for a sample with 3 elements in each subgroup.

To calculate process capacity as discussed above, first calculate the standard deviation:

$$ \widehat{\sigma} = \dfrac{\overline{R}}{d_2} = \dfrac{0,365}{1,693} = 0,2156 $$

To calculate $C_p$ and $C_{pk}$ First we obtain the side indices

$$C_{pS} = \dfrac{LSE - \mu}{3\widehat{\sigma}} = \dfrac{12 - 10,51}{3 \ast 0,215} = 2,301$$

$$C_{pI} = \dfrac{\mu - LIE}{3\widehat{\sigma}} = \dfrac{10,51 - 9}{3 \ast 0,215} = 2,335$$

The worst situation (the one in which the process generates the highest percentage of defects) is evaluated by the $C_{pk}$, that is,

$$C_{pk} = \min \lbrace C_{pI}, C_{pS} \rbrace = \min \lbrace 2,335;2,301 \rbrace = 2,301 $$

We also get the $C_p$

$$C_p = \dfrac{C_{pI} + C_{pS}}{2} =\dfrac{2,301+2,335}{2}=2,319$$

3.2.2 Process performance indices: $P_p$ and $P_{pk}$

In situations where it is only possible to quantify, in addition to common causes, special causes of variation, we will use the indices proposed by Herman (1989). These indices are known as process performance indices. If the process is stable, the capacity indices will be very close to the performance indices. However, a large difference between capacity and performance indicates the existence of instability in the process, that is, special causes are acting.

Calculation of indices $P_{p}$ and $P_{pk}$ are similar to indices $C_{p}$ and $C_{pk}$. In this way, we have

$$P_p = \dfrac{\hbox{Variabilidade Permitida do Processo}}{\hbox{Variabilidade Total}}$$

i.e.

$$P_p = \dfrac{LSE - LIE}{6\sigma}$$

Therefore, the index $P_{p}$ can be estimated by

$$\widehat{P}_p = \dfrac{LSE - LIE}{6\widehat{\sigma}}$$

Figura3.2.1

Figure 3.2.7: Estimation of the process performance index $\hat{P}_p$

For the upper unilateral specification we have

$$PPS = \dfrac{LSE - \mu }{3\sigma} = \dfrac{LSE - \mu}{\frac{\hbox{Variabilidade Total}}{2}}$$

and for the lower unilateral specification

$$PPI = \dfrac{\mu - LIE}{3\sigma}$$

where $μ$ is the process average.

The relationship between $P_{p}$ and the pair (PPI, PPS) is given by

$$P_p = \dfrac{PPI + PPS}{2}$$

A generalization for the case of bilateral specifications is the index

$$P_{pk} = \hbox{mínimo entre PPI e PPS}$$

$$P_{pk} = \min\lbrace PPI, PPS \rbrace$$

Let’s look at the performance indices in Figure 3.2.7.

Figura 3.2.7

Figure 3.2.7: Process performance indices.

Standard deviation estimation

Below we will present several methods for estimating standard deviation, which is a fundamental part of Process Performance.

Long-term variability

The best way to estimate this variability is through the sample standard deviation

$$\widehat{\sigma} = s = \sqrt{\dfrac{\displaystyle\sum_{i=1}^{n}(x_i-\overline{x})^2}{n-1}}$$

in which $x_i$ represents the process measurements, $\overline{x}$ corresponds to the sample average of all process measurements and n to the number of measurements obtained from the process.

To adjust the standard deviation in relation to the bias we take

$$\widehat{\sigma}_{\hbox{ajust}} = \dfrac{s}{c_{4}(n)} = \dfrac{\sqrt{\dfrac{\displaystyle\sum_{i=1}^{n}(x_i-\overline{x})^2}{n-1}}}{c_{4}(n)}$$

where the value of $c_{4}$ is tabulated in the Appendix.

Some practical situations are analyzed below:

  • Situation 1: When data is obtained via a graph $\overline{X}$ and R the traditional estimate ($\overline{R}/d_2$) is only valid if the process is under control.

  • Situation 2: When we take a sample from a population, the sample standard deviation (s) is the only way to estimate long-term variability.

Below we present an example involving the concepts discussed.

Example 2.2.1

Let’s calculate the process performance for Example 2.1.1, consider in this case a sample standard deviation s = 0.14.

The specifications are: LSE = 10.9, VN = 10.7, LIE = 10.5, $\overline{x}$ = μ = 10.662 and $\widehat{\sigma} = s = 0,14$.

For the upper and lower unilateral specifications we have

$$PPI = \dfrac{\overline{x} - LIE}{3s} = \dfrac{10,662 - 10,5}{3 \ast 0,14} = \dfrac{0,162}{0,42} = 0,386$$

$$PPS = \dfrac{LSE - \overline{x}}{3s} = \dfrac{10,9 - 10,662}{3 \ast 0,14} = \dfrac{0,238}{0,42} = 0,567$$

So,

$$P_p = \dfrac{PPI + PPS}{2} = \dfrac{0,386 + 0,567}{2} = 0,4765$$

The worst situation (the one in which the process generates the highest percentage of defects) is evaluated by the $P_{pk}$. Therefore,

$$P_{pk} = \min\lbrace PPI, PPS \rbrace = \min \lbrace 0,386; ~0,567 \rbrace = 0,386.$$

Handling one-sided tolerances

In some cases, we only have engineering upper or lower limits. Therefore, we cannot calculate the index $P_{p}$. In these cases, the CEP manual (2nd Edition) proposes the following strategy:

  • Upper limit only

    • $P_{pk}$ = $PPS$;

    • $P_{p}$ does not apply;

    • $PPI$ does not apply.

  • Lower limit only

    • $P_{pk}$ = $PPI$;

    • $P_{p}$ does not apply;

    • $PPS$ does not apply.

Example 2.2.2

To illustrate the calculations of process performance indices, we will use the same set of data as in example 2.1.2 of the previous section, in which the necessary assumptions for the following calculations have already been confirmed.

The specifications are: $LSE = 12$ , $LIE = 9$ , $\overline{x} = μ = 10,51$ and $\widehat{\sigma} = s = 0,23$.

For the upper and lower unilateral specifications we have

$$PPI = \dfrac{\overline{x} - LIE}{3s} = \dfrac{10,51- 9}{3 \ast 0,23} = 2,142$$

$$PPS = \dfrac{LSE - \overline{x}}{3s} = \dfrac{12 - 10,51}{3 \ast 0,23} = 2,11$$

So,

$$P_p = \dfrac{PPI + PPS}{2} = \dfrac{2,142;+ 2,11}{2} = 2,126$$

The worst situation (the one in which the process generates the highest percentage of defects) is evaluated by the $P_{pk}$. Therefore,

$$P_{pk} = \min \lbrace PPI, PPS \rbrace = \min \lbrace 2,142; ~2,11 \rbrace = 2,11.$$

3.2.3 Confusion with indexes $C_p$ and $P_p$ and $C_{pk}$ and $P_{pk}$

Some companies, especially those that are not subject to ISO - TS - 16949, do not use the indexes $C_{p}$, $C_{pk}$, $P_{p}$ and $P_{pk}$, as they have been presented so far. Use only indexes $C_{p}$ and $C_{pk}$ calculated as if they were $P_{p}$ and $P_{pk}$, respectively. That is,

$$C_p = \dfrac{\hbox{Variabilidade Permitida do Processo}}{\hbox{Variabilidade Total}}$$

i.e.

$$C_p = \dfrac{LSE - LIE}{6\sigma}$$

Where $σ$ must be estimated by

$$\widehat{\sigma} = s = \sqrt{\dfrac{\sum_{i=1}^{n}(x_i-\overline{x})^2}{n-1}}$$

Figura3.2.1

Figure 3.2.8: Process capability index

For the upper unilateral specification we have

$$C_{pS} = \dfrac{LSE - \mu}{3\sigma} = \dfrac{LSE - \mu}{\dfrac{\hbox{Variabilidade Total}}{2}}$$

and for lower unilateral specification

$$C_{pI} = \dfrac{\mu - LIE}{3\sigma} = \dfrac{\mu - LIE}{\dfrac{\hbox{Variabilidade Total}}{2}}$$

where ${\mu}$ is the process average and ${\sigma}$ must be estimated by $\widehat{\sigma}$.

So, we have to

$$C_{pk} = \min\lbrace C_{pI}, C_{pS} \rbrace$$

Figura3.2.9

Figure 3.2.9: Process capability index

When the process is “under statistical control”, the variation between samples is not significant and the total variation, measured by s, is very close to the variation within. So, $C_{p}$ and $C_{pk}$ defined above, are practically the same as what we calculated using only variation within.

When the process is “out of statistical control” the values of $C_{p}$ and $C_{pk}$ defined above, are notably distinct from the values $P_{p}$ and $P_{pk}$ as presented in previous sections.

3.2.4 Difference between Capacity and Process Performance

Process capacity and performance indices are used to evaluate the process against specifications. The capacity index only considers the inherent variation of the process, also called “short-term” variation (Breyfogle (2003)). The variation inherent to the process uses the portions of variation due to common causes and for this reason can only be evaluated for a stable process. Thus, the capability index describes the best the process can do, not directly addressing how the process is performing in relation to customer expectations. It is worth noting that capacity indices are only calculated for data (or transformed data) with approximately normal distribution.

On the other hand, the performance index considers the total variation of the process, also called “long-term” variation (Breyfogle (2003)). This index evaluates the process behavior in relation to customer needs, as it uses the total variability of the process, which encompasses common and special causes of variation. If the process is stable, only common causes of variation are present, the capacity and performance indices are similar. The difference in concept between capacity and performance indices can also be found in ISO 22514.

In order to illustrate the difference between short-term variation and long-term variation, Figure 3.2.10 is presented.

Figura3.2.10

Figure 3.2.10: Process Performance Analysis (unstable process)

In figure 3.2.10, the variation inherent to the process corresponds to the variation within the red curves, that is, the variation within each subgroup. So, although there is a shift in the process characteristic for each subgroup, which may come from special causes of variation acting on the process, short-term variability does not consider this shift. In the case of long-term variation, there is the variation of all observations, which corresponds to the blue band. So, the long-term variation considers the displacement of each subgroup, that is, the long-term variation does not neglect special causes acting on the process. For Figure 3.2.10, short-term variability is smaller than long-term variability. In Figure 3.2.11, a scenario is illustrated in which short-term variability is equal to long-term variability.

Figura3.2.11

Figure 3.2.11: Process Performance Analysis (stable process)

In figure 3.2.11, again the variation inherent to the process (short-term variation) corresponds to the variation within the red curve and the long-term variation corresponds to the variation that occurs in the blue curve. In this case, unlike Figure 3.2.11, the short-term variation is equal to the long-term variation. Note also that the process characteristic is centered and that the variation at each time is similar, which leads us to conclude that we have a stable process (under control).

Below, we present an example to illustrate the difference between process capacity and performance indices.

Example 2.4.1:

Consider the following example, in which there is a rational subgroup of size 1. In this example, the upper specification limit ($LSE$) is given by $98,25$ and the lower specification limit ($LIE$) is given by $98,15$.

Observations
98,212 98,198 98,190
98,230 98,187 98,181
98,218 98,199 98,179
98,215 98,192 98,187
98,216 98,207 98,192
98,220 98,210 98,208
98,219 98,209 98,195
98,216 98,193 98,196
98,207 98,204 98,176
98,208 98,202 98,186
98,216 98,222 98,194
98,215 98,214 98,165
98,192 98,204 98,158
98,193 98,166 98,186
98,171 98,168 98,198
98,186 98,169 98,205
98,187 98,175 98,215
98,197 98,175 98,243
98,191 98,191 98,241

Table 3.2.3: Observation values

For the graph of individual values, it is essential to evaluate the normality of the results. Therefore, the first step in the analysis is to test the normality hypothesis.

Tests Statistics P-values
Anderson - Darling 0,2681 0,6717
Kolmogorov - Smirnov 0,0655 0,7857
Shapiro - Wilk 0,9855 0,7246
Ryan - Joiner 0,9935 0,7234

Table 3.2.4: Normality tests

Using the normality tests presented in the table above, at a significance level of 5%, the hypothesis of data normality is not rejected. Thus, you can proceed with the analysis of the control chart.

Figura3.2.12

Figure 3.2.12: Control charts

With the control chart, it can be verified that there is a special cause acting on the process and in this case, there is an unstable process. Continuing with the example, the process capacity and performance indices are calculated.

$\overline{x}$ = 98.1980; LSE = 98.25; LIE = 98.15; $\widehat{\sigma}$ = 0,0085.

With the values above, the capacity indices are calculated

$$C_{pS} = \dfrac{LSE - \mu}{3\widehat{\sigma}} = \dfrac{98,25- 98,198}{3 \ast 0,0085} = 2,0224$$

$$C_{pI} = \dfrac{\mu - LIE}{3\widehat{\sigma}} = \dfrac{98,198 - 98,15}{3 \ast 0,0085} = 1,8708$$

$$C_{pk} = \min \lbrace C_{pI}, C_{pS} \rbrace =1,8708 $$

$$C_p = \dfrac{C_{pI} + C_{pS}}{2} =\dfrac{1,8708+2,0224}{2}=1,9466$$

Note that the process capability indices are above the usual criteria of 1.33 and 1.67, which leads to the conclusion that the process is capable of meeting customer expectations. For performance indices we have:

$$PPS = \dfrac{LSE - \mu}{3\widehat{\sigma}} = \dfrac{98,25- 98,198}{3 \ast 0,0186} = 0,9309$$

$$PPI = \dfrac{\mu - LIE}{3\widehat{\sigma}} = \dfrac{98,198 - 98,15}{3 \ast 0,0186} = 0,8611$$

$$P_{pk} = \min \lbrace C_{pI}, C_{pS} \rbrace =0,8611$$

$$P_p = \dfrac{C_{pI} + C_{pS}}{2} =\dfrac{0,8611+0,9309}{2}=0,896$$

Note that the process performance index is consistent with the data, as according to the histogram (Figure 3.2.13), the process covers the entire specification range. For a process centered on $C_{pk}$ close to 2, the process should only occupy half of the specification range. This is a consequence of the fact that the process presents special causes of variation and the short-term variability, used to calculate the capacity index, only considers the variability due to common causes.

As a consequence, in the presence of special causes, capacity indices do not represent process behavior in relation to customer specifications. On the other hand, even in the presence of special causes of variation, performance indices adequately represent the behavior of the process, as they use the total variability of the process. If the process is stable, free from special causes of variation, it is known that both indices are equivalent. Based on these considerations, we consider the performance indices ($P_p$ and the $P_{pk}$) as the appropriate indices to describe the process behavior in relation to specifications.

Figura3.2.13

Figure 3.2.13: Process Performance Analysis

↑