3.7 Effect of data normality on capacity calculation
When data normality is not detected, we look for a method that best fits the data. When these procedures are not carried out and the data is assumed to have a normal distribution (even though it does not) the results obtained for the capacity/performance indices are different, often masked and also absurd. Below we illustrate this effect of normality in process capacity/performance calculations through an example.
Example 7.1
In this example we present data relating to torque control applied by a screwdriver when assembling bus chassis. Five parts were inspected every hour with a torque sensor. For this case we will consider the following specifications: $LIE = 480$ and $LSE = 720$.
| Data Collection | Determined Values | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Subgroup | X1 | X2 | X3 | X4 | X5 | $\overline{X}$ | Xmax | Xmin | R |
| 1 | 623 | 589 | 618 | 620 | 613 | 612,6 | 623 | 589 | 34 |
| 2 | 618 | 604 | 594 | 618 | 606 | 608 | 618 | 594 | 24 |
| 3 | 637 | 584 | 608 | 608 | 608 | 609 | 637 | 584 | 53 |
| 4 | 618 | 635 | 618 | 630 | 608 | 621,8 | 635 | 608 | 27 |
| 5 | 587 | 606 | 604 | 616 | 608 | 604,2 | 616 | 587 | 29 |
| 6 | 608 | 601 | 601 | 606 | 580 | 599,2 | 608 | 580 | 28 |
| 7 | 599 | 589 | 664 | 618 | 728 | 639,6 | 728 | 589 | 139 |
| 8 | 584 | 637 | 599 | 628 | 606 | 610,8 | 637 | 584 | 53 |
| 9 | 584 | 606 | 587 | 584 | 620 | 596,2 | 620 | 584 | 36 |
| 10 | 623 | 632 | 604 | 580 | 601 | 608 | 632 | 580 | 52 |
| 11 | 589 | 611 | 599 | 592 | 589 | 596 | 611 | 589 | 22 |
| 12 | 592 | 726 | 580 | 589 | 618 | 621 | 726 | 580 | 146 |
| 13 | 604 | 613 | 599 | 611 | 599 | 605,2 | 613 | 599 | 14 |
| 14 | 611 | 596 | 611 | 580 | 613 | 602,2 | 613 | 580 | 33 |
| 15 | 589 | 709 | 592 | 625 | 687 | 640,4 | 709 | 589 | 120 |
| 16 | 628 | 592 | 608 | 637 | 656 | 624,2 | 656 | 592 | 64 |
| 17 | 606 | 584 | 604 | 592 | 620 | 601,2 | 620 | 584 | 36 |
| 18 | 613 | 604 | 618 | 592 | 584 | 602,2 | 618 | 584 | 34 |
| 19 | 596 | 587 | 613 | 618 | 592 | 601,2 | 618 | 587 | 31 |
| 20 | 581 | 604 | 580 | 611 | 613 | 597,8 | 613 | 580 | 33 |
| 21 | 608 | 623 | 604 | 584 | 606 | 605 | 623 | 584 | 39 |
| 22 | 616 | 599 | 616 | 714 | 611 | 631,2 | 714 | 599 | 115 |
| 23 | 632 | 618 | 611 | 584 | 592 | 607,4 | 632 | 584 | 48 |
| 24 | 620 | 587 | 580 | 613 | 608 | 601,6 | 620 | 580 | 40 |
| 25 | 608 | 582 | 599 | 604 | 604 | 599,4 | 608 | 582 | 26 |
| $\overline{\overline{X}}=609,816$ | $\overline{R}=51,04$ |
Table 3.7.1: Torque data applied to screws by a screwdriver.
Let’s check the stability of the process through the control chart below
Figure 3.7.1: Graphics $\overline{X}$ and $R.$
We can see that the process is out of control, as there are points more than 3 standard deviations from the center line in both graphs. Let us also observe the QQ-plot graphs below and verify that the normal distribution does not fit the data, which can be proven by the p-value associated with the Anderson-Darling test.
| Distributions | Statistics | P-Value |
|---|---|---|
| Normal(mu = 609.82, sigma = 27) | 6.7047 | 0 |
| Weibull(Shape = 16.1302, Scale = 624.299) | 15.2221 | 0.01 |
| Log-Normal(log(mu) = 6.41227, log(sigma) = 0.0414417) | 5.6595 | 0 |
Table 3.7.2: Anderson-Darling test
Figure 3.7.2: QQ-plot graph
However, we will analyze the capacity/performance of the process assuming normality.
Thus, for short-term variability we have
$$\widehat{\sigma} = \dfrac{\overline{R}}{d_2} = \dfrac{51,04}{2,326} = 21,9433$$
being $d_{2}$ = 2.326 (for n = 5) tabulated in the Appendix.
$$C_p = \dfrac{LSE - LSI}{6\widehat{\sigma}} = \dfrac{720 - 480}{131,66} = 1,8229$$
$$C_{pk} = \min\left\lbrace\dfrac{LSE - \overline{\overline{X}}}{3\widehat{\sigma}}~;~\dfrac{\overline{\overline{X}} - LIE}{3\widehat{\sigma}}\right\rbrace$$
$$C_{pk} = \min\left\lbrace\dfrac{720 - 609,816}{65,8299}~;~\dfrac{609,816 - 480}{65,8299}\right\rbrace$$
$$C_{pk} = \min\lbrace1,6738~;~1,9720\rbrace = 1,6738$$
The worst situation, which occurs when the process generates the highest percentage of defects, is evaluated by the $P_{pk}$ with standard deviation s = 26.6047.
$$PPI = \dfrac{\overline{\overline{X}} - LIE}{3 \ast s} = \dfrac{609,816 - 480}{3 \ast 26,6047} = \dfrac{129,816}{79,8141} = 1,6265$$
$$PPS = \dfrac{LSE - \overline{\overline{X}}}{3 \ast s} = \dfrac{720 - 609,816}{3 \ast 26,6047} = \dfrac{110,184}{79,8141} = 1,3805$$
So,
$$P_p = \dfrac{PPI + PPS}{2} = \dfrac{1,3805 + 1,6265}{2} = 1,5035$$
$$P_{pk} = \min\lbrace PPI; PPS \rbrace = \min \lbrace 1,3805;~1,6265 \rbrace = 1,3805$$
Below are the results obtained by Software Action for this example.
| Value | |
|---|---|
| Sample: | 125 |
| Lower Limit | 480 |
| Upper Limit | 720 |
Table 3.7.3: Specifications (normal data)
| Estimate | |
|---|---|
| Average | 609.816 |
| Standard Deviation (Short term) | 21.9439 |
| Standard Deviation (Long term) | 26.6047 |
Table 3.7.4: Estimates (normal data)
| Performance Indexes (Total Variability) | |
|---|---|
| PP | 1.5035 |
| PPI | 1.6265 |
| PPS | 1.3805 |
| PPK | 1.3805 |
Table 3.7.5: Performance Indices (Long term) (normal data)
| Capacity Indices (Inherent Variability) | |
|---|---|
| CP | 1.8228 |
| CPI | 1.9719 |
| CPS | 1.6737 |
| CPK | 1.6737 |
Table 3.7.6: Capacity Indexes (Short term) (normal data)
| Observed Indices | |
|---|---|
| PPM < LIE | 0 |
| PPM > LSE | 16000 |
| Total PPM | 16000 |
Table 3.7.7: Observed Indexes (normal data)
| Expected Indices (Total Variability) | |
|---|---|
| PPM < LIE | 0.532 |
| PPM > LSE | 17.2509 |
| Total PPM | 17.7828 |
Table 3.7.8: Expected Indices (Long term) (normal data)
| Expected Indices (Inherent Variability) | |
|---|---|
| PPM < LIE | 0.0017 |
| PPM > LSE | 0.2568 |
| Total PPM | 0.2584 |
Table 3.7.9: Expected Indices (Short term) (normal data)
Figure 3.7.3: Process performance analysis graph assuming normal data.
Now, let’s do the process capacity/performance analysis correctly and compare the results with those obtained above.
The capacity results found via the normal distribution do not make sense, as we have a $C_{pk}$ of 1.67 with scrap parts in the dataset. Therefore, we need an appropriate technique for this case. When we look at the QQ-plot graph in Figure 3.7.2, we see that no tested distribution (Normal, Weibull or lognormal) fits the data. Therefore, we will perform a performance analysis of the process using the Kernel method, which is a non-parametric method suitable for the data set under study.
Below we have the results obtained by Software Action for this case.
| Value | |
|---|---|
| Sample: | 125 |
| Lower Limit | 480 |
| Upper Limit | 720 |
Table 3.7.10: Specifications
| Parameters | Value |
|---|---|
| Average: | 609.816 |
| Standard Deviation: | 26.60475 |
Table 3.7.11: Estimates
| Performance Indexes | |
|---|---|
| PP | 1.4125 |
| PPI | 3.1595 |
| PPS | 0.8751 |
| PPk | 0.8751 |
Table 3.7.12: Performance Indexes
| Observed Indices | |
|---|---|
| PPM > LSE | 16000 |
| PPM < LIE | 0 |
| PPM Total | 16000 |
Table 3.7.13: Observed Indexes
| Expected Indexes | |
|---|---|
| PPM > LSE | 15462.9333940826 |
| PPM < LIE | 0 |
| PPM Total | 15462.9333940826 |
Table 3.7.14: Expected Indexes
Figure 3.7.4: Process performance analysis graph - core method.
Table 3.7.15 makes an illustrative comparison of the performance indices showing that, if a normal distribution is assumed for the data when they, in fact, do not follow this distribution, we may obtain misleading results.
| Performance Indexes | Normal | Core method |
|---|---|---|
| pp | 1,503 | 1,412 |
| PPI | 1,626 | 3,159 |
| PPS | 1,381 | 0,875 |
| ppk | 1,381 | 0,875 |
Table 3.7.15: Comparison of performance indices.