On this page
3.5 Performance Analysis for Attributes
Capacity for attributional data is simply defined as the average proportion or nonconformity rate of the product (AIAG, 1995) whereas variable graphs refer to variation ($6\widehat{\sigma}_{R/d_2}$) inherent produced by the stable process.
3.5.1 Performance analysis for binomial data
Data with binomial distribution are associated with the recorded number of defective items in relation to the total number of items present in the sample.
-
The result of each evaluated item must be obtained under the same evaluation conditions as the other items.
-
The item results are independent.
-
The result of the evaluation of each item is classified as success or failure.
The average proportion is given by
$$\overline{p} = \dfrac{D_{Tot}}{N_{Tot}}$$
in which
$D_{Tot}$ = Sum of the quantities of defective items in each sample.
$N_{Tot}$ = Number of items evaluated.
The percentage (%) of defectives is given by
$$\char37 \hbox{Defeituosos} = \overline{p}\ast 100$$
Confidence interval for percentage defective
The lower and upper limits (LI and LS) are given by
$$LI = \dfrac{\nu_{1} \ast F_{\left(\frac{\alpha}{2},~\nu_{1},~\nu_{2}\right)}}{\nu_2 +\nu_1 \ast F_{\left(\frac{\alpha}{2},~\nu_{1},~\nu_{2}\right)}}$$
$$LS = \dfrac{\nu_{3} \ast F_{\left(1-\frac{\alpha}{2},~\nu_{3},~\nu_{4}\right)}}{\nu_4 +\nu_3 \ast F_{\left(1-\frac{\alpha}{2},~\nu_{3},~\nu_{4}\right)}}$$
$$\char37~\hbox{Defeituosos} ~LI = LI \ast 100$$
in which
-
$\nu_1 = 2 \ast D_{Tot}$
-
$\nu_2 = 2 \ast (N_{Tot} - D_{Tot} + 1)$
-
$\nu_3 = 2 \ast (D_{Tot} + 1)$
-
$\nu_4 = 2 \ast (N_{Tot} - D_{Tot})$
-
$F_{\left(\frac{\alpha}{2},~\nu_1,~\nu_2\right)}$ = quantile of the F distribution with $\nu_1$ and $\nu_2$ degrees of freedom and which leaves an area of $\alpha/2$ on the left.
-
$F_{\left(1 - \frac{\alpha}{2},~\nu_3,~\nu_4\right)}$ = quantile of the F distribution with $\nu_3$ and $\nu_4$ degrees of freedom and which leaves an area of $1 - \alpha/2$ on the left.
Confidence interval for PPM
PPM: It is the expected number of defective parts in one million parts produced.
$$\hbox{Limite inferior} = 1.000.000 \ast (LI)$$
$$\hbox{Limite superior} = 1.000.000 \ast (LS)$$
Capacity Index (Z)
The higher the value of the capacity index (Z), the better the process performance.
$$\hbox{Processo Z} = -1 \ast \phi^{-1}(\overline{p})$$
in which
$\phi^{-1}(\overline{p})$: quantile of the standard normal distribution (0.1) with accumulated area equal to $\overline{p}$. This function can be calculated directly by Software Action.
Confidence interval for the capacity index (Z)
$$\hbox{Limite inferior} = -1 \ast \phi^{-1}(LI)$$
$$\hbox{Limite superior} = -1 \ast \phi^{-1}(LS)$$
Example 5.1.1
An industry is interested in analyzing the capacity of the process in which the proportion of defective parts in batches of 1000 pieces is verified. The data are in Table 3.5.1.
| Sample | Defective parts | Total pieces in the sample |
|---|---|---|
| 1 | 432 | 1000 |
| 2 | 392 | 1000 |
| 3 | 497 | 1000 |
| 4 | 459 | 1000 |
| 5 | 433 | 1000 |
| 6 | 424 | 1000 |
| 7 | 470 | 1000 |
| 8 | 455 | 1000 |
| 9 | 427 | 1000 |
| 10 | 424 | 1000 |
| 11 | 410 | 1000 |
| 12 | 386 | 1000 |
| 13 | 496 | 1000 |
| 14 | 424 | 1000 |
| 15 | 425 | 1000 |
| 16 | 428 | 1000 |
| 17 | 392 | 1000 |
| 18 | 460 | 1000 |
| 19 | 425 | 1000 |
| 20 | 405 | 1000 |
| TOTAL | 8664 | 20000 |
Table 3.5.1: Part batch data.
$$\overline{p} = \dfrac{D_{Tot}}{N_{Tot}} = \dfrac{8664}{20000} = 0,4332$$
$$\char37 \hbox{Peças defeituosas} = 43,32.$$
Confidence interval for % defective parts
Calculating the values of $\nu$ and F we have
$$\nu_1 = 2 \ast D_{Tot} = 2 \ast (8664) = 17328$$
$$\nu_2 = 2 \ast (N_{Tot} - D_{Tot} + 1) = 2 \ast (20000 - 8664 + 1) = 22674$$
$$\nu_3 = 2 \ast (D_{Tot} + 1) = 2 \ast (8664 + 1) = 17330$$
$$\nu_4 = 2 \ast (N_{Tot} - D_{Tot}) = 2 \ast (20000 - 8664) = 22672$$
$$F_{\left(\frac{\alpha}{2},~\nu_1,~\nu_2\right)} = 0,9723927$$
$$F_{\left(1-\frac{\alpha}{2},~\nu_3,~\nu_4\right)} = 1,028336$$
Therefore, the limits are given by
$$\hbox{Limite inferior}~(LI) = \dfrac{\nu_{1} \ast F_{\left(\frac{\alpha}{2},~\nu_{1},~\nu_{2}\right)}}{\nu_2 + \nu_1 \ast F_{\left(\frac{\alpha}{2},~\nu_{1},~\nu_{2}\right)}}$$
that is,
$$LI = \dfrac{17328 \ast 0,972}{22674 + (17328 \ast 0,972)} = \dfrac{16842,82}{22674 + 16842,82} = 0,426219$$
$$\char37~LI ~ \hbox{para peças defeituosas} = LI \ast 100 = 0,426219 \ast 100 = 42,6219$$
For the upper limit we have
$$\hbox{Limite superior}~(LS) = \dfrac{\nu_{3} \ast F_{\left(1-\frac{\alpha}{2},~\nu_{3},~\nu_{4}\right)}}{\nu_4 +\nu_3 \ast F_{\left(1-\frac{\alpha}{2},~\nu_{3},~\nu_{4}\right)}}$$
$$LS = \dfrac{17330 \ast 1,028336}{22672 + (17330 \ast 1,028336)} = \dfrac{17821,06}{22672 + 17821,06} = 0,440102$$
$$\char37~LS~\hbox{para peças defeituosas} = LS \ast 100 = 0,440102 \ast 100 = 44,0102$$
Confidence interval for PPM
$$PPM = \overline{p} \ast 1.000.000 = 0,4332 \ast 1.000.000 = 433200$$
$$\hbox{Limite inferior} = 1.000.000 \ast LI = 1.000.000 \ast 0,426219 = 426219$$
$$\hbox{Limite superior} = 1.000.000 \ast LS = 1.000.000 \ast 0,440102 = 440102$$
Capacity Index (Z)
$$\hbox{Processo Z} = -1 \ast \phi^{-1}(\overline{p}) = -1 \ast \phi^{-1}(0,4332) = 0,168233$$
being
$$\phi^{-1}(\overline{p}) = -0,168233$$
Confidence interval for capacity index (Z)
$$\hbox{Limite superior} = -1 \ast \phi^{-1}(0,440102) = 0,1507114$$
$$\hbox{Limite inferior} = -1 \ast \phi^{-1}(0,426219) = 0,1857569$$
Below are the results obtained by Software Action for this example.
| Defect Percentage: | |
|---|---|
| Target % (Optional) | 0 |
| Defect Percentage: | 43.32 |
| Lower Limit: | 42.631773 |
| Upper Limit: | 44.01017 |
Table 3.5.2: Percentage of Defects
| Defect Rate | |
|---|---|
| Defect Rate: | 0.4332 |
| Lower Limit: | 0.426318 |
| Upper Limit: | 0.440102 |
Table 3.5.3: Defect Rate
| ICP | |
|---|---|
| ICP | 0.168233 |
| Lower Limit: | 0.185757 |
| Upper Limit: | 0.150711 |
Table 3.5.4: ICP
Figure 3.5.1: Process performance analysis graphs.
3.5.2 Performance analysis for Poisson data
Data with Poisson distribution are associated with the number of nonconformities observed in a certain item (sample) over space/time.
-
The rate of nonconformities per unit (time, measure, etc.) is the same for any item.
-
The number of nonconformities observed in an item is independent of any other.
The average number of nonconformities per item is given by the fraction
$$\overline{\hbox{Def}} = \dfrac{D_{Tot}}{N}$$
in which
$D_{Tot}$ = Sum of all non-conformities
N = Number of samples.
Confidence interval for $\overline{\hbox{Def}}$ with 95% confidence
The limits are given by
$$\hbox{Limite inferior}~(LI) = 0,5 \ast \dfrac{1}{N_{Tot}} \ast \chi^2_{\left(\frac{\alpha}{2},~\nu_{1}\right)}$$
$$\hbox{Limite superior}~(LS) = 0,5 \ast \dfrac{1}{N_{Tot}} \ast \chi^2_{\left(1 - \frac{\alpha}{2},~\nu_{2}\right)}$$
in which
-
$\nu_{1} = 2 \ast D_{Tot}$
-
$\nu_{2} = 2 \ast (D_{Tot} + 1)$
-
$\chi^2_{\left(\frac{\alpha}{2},~\nu_{1}\right)}$ = quantile of the chi-square distribution with $\nu_{1}$ degrees of freedom and which leaves an area of $\alpha/2$ on the left.
-
$\chi^2_{\left(1 - \frac{\alpha}{2},~\nu_{2}\right)}$ = quantile of the chi-square distribution with $\nu_{2}$ degrees of freedom and which leaves an area of $1 - \alpha/2$ on the left.
The average number of nonconformities per unit of measurement among all samples is given by
$$\overline{DPU} = \dfrac{D_{Tot}}{N_{Tot}}$$
in which
$D_{Tot}$ = Sum of all non-conformities
$N_{Tot}$ = Sum of all sample sizes.
Confidence interval for $\overline{DPU}$ with 95% confidence
The limits are given by
$$\hbox{Limite inferior}~(LI) = 0,5 \ast \dfrac{1}{N} \ast \chi^2_{\left(\frac{\alpha}{2},~\nu_{1}\right)}$$
$$\hbox{Limite superior}~(LS) = 0,5 \ast \dfrac{1}{N} \ast \chi^2_{\left(1 - \frac{\alpha}{2},~\nu_{2}\right)}$$
in which
-
$\nu_{1} = 2 \ast D_{Tot}$
-
$\nu_{2} = 2 \ast (D_{Tot} + 1)$
-
$\chi^2_{\left(\frac{\alpha}{2},~\nu_{1}\right)}$ = quantile of the chi-square distribution with $\nu_{1}$ degrees of freedom and which leaves an area of $\alpha/2$ on the left.
-
$\chi^2_{\left(1 - \frac{\alpha}{2},~\nu_{2}\right)}$ = quantile of the chi-square distribution with $\nu_{2}$ degrees of freedom and which leaves an area of $1 - \alpha/2$ on the left.
Still,
$\min\lbrace DPU \rbrace$: is the lowest DPU value among all samples.
$\max\lbrace DPU \rbrace$: is the highest DPU value among all samples.
Example 5.2.1
An industry is interested in analyzing the capacity of the process in which the number of non-conforming points on a steel blade is verified, with each blade measuring 50 $cm^2$. The data is shown in Table 3.5.5.
| Sample | Non-conformity number | Sample Size ($cm^2$) |
|---|---|---|
| 1 | 2 | 50 |
| 2 | 4 | 50 |
| 3 | 3 | 50 |
| 4 | 1 | 50 |
| 5 | 2 | 50 |
| 6 | 5 | 50 |
| 7 | 2 | 50 |
| 8 | 5 | 50 |
| 9 | 4 | 50 |
| 10 | 1 | 50 |
| 11 | 6 | 50 |
| 12 | 3 | 50 |
| 13 | 3 | 50 |
| 14 | 6 | 50 |
| 15 | 1 | 50 |
| 16 | 4 | 50 |
| 17 | 1 | 50 |
| 18 | 8 | 50 |
| 19 | 1 | 50 |
| 20 | 4 | 50 |
| 21 | 4 | 50 |
| 22 | 2 | 50 |
| 23 | 4 | 50 |
| 24 | 2 | 50 |
| 25 | 1 | 50 |
| 26 | 2 | 50 |
| 27 | 2 | 50 |
| 28 | 3 | 50 |
| 29 | 4 | 50 |
| 30 | 4 | 50 |
| Total | 94 | 1500 |
Table 3.5.5: Defects in a steel blade.
$$\overline{\hbox{Def}} = \dfrac{D_{Tot}}{N} = \dfrac{94}{30} = 3,13333$$
Confidence interval for $\overline{\hbox{Def}}$ with 95% confidence
Calculating $\nu_1$ and $\nu_2$ we get
$$\nu_1 = 2 \ast D_{Tot} = 2 \ast 94 = 188$$
$$\nu_2 = 2 \ast (D_{Tot} + 1) = 2 \ast 95 = 190$$
With this, the limits will be
$$LI = 0,5 \ast \dfrac{1}{N_{Tot}} \ast \chi^2_{(0,025,~\nu_{1})} = 0,5 \ast \dfrac{1}{30} \ast 151,9231 = 2,532052$$
$$LS = 0,5 \ast \dfrac{1}{N_{Tot}} \ast \chi^2_{(0,975,~\nu_{2})} = 0,5 \ast \dfrac{1}{30} \ast 230,0644 = 3,834407$$
$$\overline{DPU} = \dfrac{D_{Tot}}{N_{Tot}} = \dfrac{94}{1500} = 0,0627$$
Confidence interval for $\overline{DPU}$ with 95% confidence
$$LI = 0,5 \ast \dfrac{1}{N_{Tot}} \ast \chi^2_{(0,025,~\nu_{1})} = 0,5 \ast \dfrac{1}{1500} \ast 151,9231 = 0,05064103$$
$$LS = 0,5 \ast \dfrac{1}{N_{Tot}} \ast \chi^2_{(0,975,~\nu_{2})} = 0,5 \ast \dfrac{1}{1500} \ast 230,0644 = 0,07668813$$
in which
-
$\nu_{1} = 2 \ast D_{Tot} = 2 \ast 94 = 188$
-
$\nu_{2} = 2 \ast (D_{Tot} + 1) = 2 \ast 95 = 190$
Still,
$$\min \lbrace DPU \rbrace = 0,02~~~~~{e}~~~~~\max \lbrace DPU \rbrace = 0,16.$$
Below are the results obtained by Software Action for this example.
| Defect Average | |
|---|---|
| Target % (Optional) | 0 |
| Defect Average: | 3.133333 |
| Lower Limit: | 2.532052 |
| Upper Limit: | 3.834406 |
Table 3.5.6: Average Defects
| Average DPU | |
|---|---|
| Average DPU: | 0.062667 |
| Lower Limit: | 0.050641 |
| Upper Limit: | 0.076688 |
| Minimum: | 0.02 |
| Maximum: | 0.16 |
Table 3.5.7: Average DPU
| Confidence Intervals (PPM) | |
|---|---|
| Average PPM: | 60743.492984 |
| Lower Limit: | 49380.161529 |
| Upper Limit: | 73821.343308 |
Table 3.5.8: Confidence Intervals (PPM)
Figure 3.5.2: Process performance analysis graphs.
Specification Limits
Specification limits are the values that define the acceptable range of a product or service, established based on customer requirements. They are defined by specific requirements and may include upper limits ($LSE$) and/or lower ($LIE$). It is then necessary to calculate the probability of being outside the specification limits according to the data distribution, the probability of failure.
$$\text{Prob. de falha} = \text{Prob}[\text{Medida} < LIE] + \text{Prob}[\text{Medida} > LSE]$$
where:
- $LIE$: Lower specification limit
- $LSE$: Upper specification limit
Generally, data associated with defect counts, it is of interest to calculate the probability of being above the upper specification limit ($LSE$) provided by the customer.
Failure Probability and PPM
It is recommended to use the Parts Per Million (PPM) metric to quantify the residual risk of failure in the cleaning process. This approach translates the statistical probability of failure into a practical and understandable metric, as it allows estimating the theoretical number of samples that could fail every one million process runs.
The expected PPM corresponding to values outside the specification limit is given by:
$$(\text{PPM}_\text{esp} > LSE) = 10^6 \times \text{Prob}[\text{Medida} > \text{LSE}]$$
Figure 3.5.3: Data visualization and quantiles (Red area represents upper area of the $LSE$).
Ppk Index Calculation
The Ppk index measures the actual performance of the process in relation to specification limits. The total noncompliance rate is converted to a standardized normal distribution scale.
The Ppk calculation can be expressed by:
$$\text{Ppk} = \frac{\Phi^{-1}(1 - (P_{LIE}+P_{LSE}))}{3}$$
where:
- $P_{LIE}$: probability of failure below the lower specification limit;
- $P_{LSE}$: probability of failure above the upper specification limit.
The limits generally adopted for evaluating process capacity are:
- Ppk ≥ 1.67: highly capable process;
- 1.33 ≤ Ppk < 1,67: processo capaz;
- 1,00 ≤ Ppk < 1,33: processo moderadamente capaz;
- Ppk < 1,00: processo incapaz, requer ações corretivas.
3.5.3 Análise de performance para dados Poisson inflacionada de zeros
Dados com distribuição poisson inflacionada de zeros estão associados com o número de não conformidades observados num certo item (amostra) ao longo do espaço/tempo, nos quais há um excesso de contagens iguais a zero.
-
A taxa de não-conformidades por unidade ($\lambda$) (tempo, medida, etc.) é a mesma para qualquer item.
-
A probabilidade de inflação de zeros ($\pi$) é a mesma para qualquer item.
-
O número de não-conformidades observados em um item é independente de qualquer outro.
O modelo ZIP (Poisson Inflacionada de Zeros) é uma extensão da distribuição de Poisson e corrige o problema do excesso de zeros adicionando um novo parâmetro π. Com isso, esse novo modelo assume dois parâmetros:
-
π: é a probabilidade de inflação, em outras palavras, a proporção de zeros extras no modelo;
-
λ: é a taxa média de ocorrência de defeitos, ou seja, o número esperado de defeitos considerando as situações em que o processo está sujeito à ocorrência de defeitos.
Os parâmetros π e λ podem ser estimados pelo método da máxima verossimilhança. Por fim, a função de densidade de probabilidade da distribuição de Poisson Inflacionada de Zeros é dada por: $$P(Y = y) = \frac{(1-\pi)(e^{-\pi} \lambda^y)}{y!}, \quad (y = 1,2,…)$$
A média de não-conformidades por item é dado pela fração
$$\overline{\hbox{Def}} = (1 - \hat{\pi}) \times (\hat{\lambda})$$
em que
$D_{Tot}$ = Soma de todas as não-conformidades
N = Quantidade de amostras.
Com o(s) limite(s) de especificação definido(s), geralmente o limite superior de especificação $LSE$, é possível calcular os índices de PPM e Ppk referente à probabilidade de falha.
A probabilidade de falha acima do limite superior de especificação é dado por: $$\text{Prob de falha} = \text{Prob}[\text{Medida} > LSE]$$
O PPM esperado correspondente a valores fora dos limites de especificação é dado por:
$$(\text{PPM}_\text{esp} > LSE) = 10^6 \times \text{Prob}[\text{Measure} > \text{LSE}]$$
O cálculo do Ppk pode ser expresso por:
$$\text{Ppk} = \frac{\Phi^{-1}(1 - (P_{LIE}+P_{LSE}))}{3}$$
Exemplo 5.3.1
Uma indústria está interessada em analisar a capacidade do processo no qual verifica-se o número de pontos não-conformes (contagem de bactérias). O limite superior de especificação é $LSE = 10$. Os dados estão dispostos na Tabela 3.5.9.
| Bacteria | Tamanho Amostra |
|---|---|
| 0 | 1 |
| 1 | 1 |
| 0 | 1 |
| 0 | 1 |
| 7 | 1 |
| 0 | 1 |
| 0 | 1 |
| 2 | 1 |
| 3 | 1 |
| 0 | 1 |
| 0 | 1 |
| 0 | 1 |
| 0 | 1 |
| 0 | 1 |
| 1 | 1 |
| 3 | 1 |
| 0 | 1 |
| 4 | 1 |
| 0 | 1 |
| 1 | 1 |
| 0 | 1 |
| 0 | 1 |
| 5 | 1 |
| 0 | 1 |
| 0 | 1 |
| 0 | 1 |
| 0 | 1 |
| 0 | 1 |
| 2 | 1 |
| 0 | 1 |
Tabela 3.5.9: Contagem de bactérias por amostra
Considera-se a distribuição Poisson Inflacionada de zeros pelo excesso de contagens nulas que há nos dados.
A estimação dos parâmetros é dada por: $$\hat{\lambda} = 2.706335 \qquad \text{e} \qquad \hat{\pi} = 0.6428133$$
Média de não-conformidades:
$$\overline{\hbox{Def}} = (1 - \hat{\pi}) \times (\hat{\lambda}) = 0.9667$$
A probabilidade de falha acima do limite superior de especificação: $$\text{Failure Prob} = \text{Prob}[\text{Measure} > LSE] = 0.000691521$$
O PPM esperado correspondente a valores fora dos limites de especificação é dado por:
$$(\text{PPM}_\text{esp} > LSE) = 10^6 \times \text{Prob}[\text{Measure} > \text{LSE}] = 691.521$$
O cálculo do Ppk pode ser expresso por:
$$\text{Ppk} = \frac{\Phi^{-1}(1 - P_{LSE})}{3} = \frac{3.1982}{3} = 1.0661$$
3.5.4 Análise de performance para dados Geométricos
Dados com distribuição Geométrica estão associados com o número de tempo (por exemplo dias) até que ocorra a primeira não-conformidade. Assim, deseja-se que resulte a maior quantidade de tempo possível. Essa distribuição é fortemente assimétrica à direita.
-
A probabilidade de ocorrência de uma não conformidade ($p$) por unidade de tempo é constante ao longo do processo.
-
Os intervalos de tempo até a ocorrência de uma não conformidade são independentes entre si.
A média de tempo até a ocorrência de uma não conformidade é dado pela fração
$$\overline{\hbox{T}} = \dfrac{T_{Tot}}{N}$$
em que
$T_{Tot}$ = Soma de todo o tempo acumulado até as não conformidades.
$N$ = Número total de amostras
Com o(s) limite(s) de especificação definido(s), geralmente o limite superior de especificação $LSE$, é possível calcular os índices de PPM e Ppk referente à probabilidade de falha.
A probabilidade de falha acima do limite superior de especificação é dado por: $$\text{Failure Prob} = \text{Prob}[\text{Measure} > LSE]$$
O PPM esperado correspondente a valores fora dos limites de especificação é dado por:
$$(\text{PPM}_\text{esp} > LSE) = 10^6 \times \text{Prob}[\text{Measure} > \text{LSE}]$$
O cálculo do Ppk pode ser expresso por:
$$\text{Ppk} = \frac{\Phi^{-1}(1 - (P_{LIE}+P_{LSE}))}{3}$$
Exemplo 5.2.1
Uma indústria está interessada em analisar a capacidade do processo no qual verifica-se o número de dias até a primeira não-conformidade. O limite superior de especificação é $LSE = 100$.
| Início | Fim | Dias | Tamanho Amostra |
|---|---|---|---|
| 3-Jan | 18-Jan | 15 | 1 |
| 20-Jan | 25-Mar | 64 | 1 |
| 27-Mar | 17-Apr | 21 | 1 |
| 18-Apr | 21-May | 33 | 1 |
| 22-May | 30-Jun | 39 | 1 |
| 1-Jul | 4-Jul | 3 | 1 |
| 5-Jul | 12-Oct | 99 | 1 |
| 13-Oct | 18-Dec | 66 | 1 |
| 19-Dec | 31-Jan | 43 | 1 |
| 1-Feb | 1-Feb | 0 | 1 |
| 2-Feb | 27-May | 114 | 1 |
| 28-May | 8-Jun | 11 | 1 |
| 9-Jun | 14-Jun | 5 | 1 |
| 15-Jun | 5-Aug | 51 | 1 |
| 6-Aug | 25-Aug | 19 | 1 |
| 26-Aug | 27-Aug | 1 | 1 |
| 28-Aug | 2-Sep | 5 | 1 |
| Total | 589 | 17 |
Tabela 3.5.10: Tempo em dias até a não conformidade.
$$\overline{\hbox{T}} = \dfrac{T_{Tot}}{N} = \dfrac{589}{17} = 34.6471$$
A probabilidade de falha acima do limite superior de especificação: $$\text{Failure Prob} = \text{Prob}[\text{Measure} > LSE] = 0.0564819566$$
O PPM esperado correspondente a valores fora dos limites de especificação é dado por:
$$(\text{PPM}_\text{esp} > LSE) = 10^6 \times \text{Prob}[\text{Measure} > \text{LSE}] = 56481.9566$$
O cálculo do Ppk pode ser expresso por:
$$\text{Ppk} = \frac{\Phi^{-1}(1 - P_{LSE})}{3} = \frac{1.585}{3} = 0.52834$$
Figura 3.5.2: Gráficos da análise de performance do processo.
3.5.5 Análise de performance para dados Empíricos
Dados com abordagem empírica estão associados a situações em que o analista não assume nenhuma distribuição teórica a priori (como Binomial, Poisson ou Geométrica) para modelar as não conformidades. Essa escolha é indicada quando o processo apresenta comportamento complexo, misturas de populações ou forte instabilidade, baseando-se a análise puramente no histórico de dados coletados.
-
A taxa de não conformidades é avaliada de forma direta sobre os dados observados, sem a pressuposição de parâmetros ideais de uma curva teórica.
-
As inferências e os limites de variabilidade do processo são estimados a partir da própria distribuição empírica da amostra.
A mediana de não conformidades por item ou subgrupo é mais priorizada que a média por ela ser uma medida sensível a valores extremos.
Com o(s) limite(s) de especificação definido(s), geralmente o limite superior de especificação $LSE$, é possível calcular os índices de PPM e Ppk referente à probabilidade de falha.
A probabilidade de falha acima do limite superior de especificação é dado por: $$\text{Failure Prob} = \frac{#[\text{Measure} > LSE]}{N}$$
em que:
-
$#[\text{Medida} > LSE]$ é a quantidade de dados/medidas acima de $LSE$;
-
$N$ é o número total de amostras
O PPM esperado correspondente a valores fora dos limites de especificação é dado por:
$$(\text{PPM}_\text{esp} > LSE) = 10^6 \times \text{Failure Prob}$$
O cálculo do Ppk pode ser expresso por:
$$\text{Ppk} = \frac{\Phi^{-1}(1 - (P_{LIE}+P_{LSE}))}{3}$$
Exemplo 5.5.1
Uma indústria está interessada em analisar a capacidade do processo no qual verifica-se a contagem de não-conformidades em um processo. O limite superior de especificação é $LSE = 100$. Não será assumido nenhuma distribuição.
| Contagem | Amostra |
|---|---|
| 5 | 1 |
| 27 | 1 |
| 31 | 1 |
| 1 | 1 |
| 0 | 1 |
| 15 | 1 |
| 22 | 1 |
| 45 | 1 |
| 23 | 1 |
| 6 | 1 |
| 5 | 1 |
| 105 | 1 |
| 9 | 1 |
| 6 | 1 |
| 1 | 1 |
| 8 | 1 |
| 81 | 1 |
| 9 | 1 |
| 7 | 1 |
| 4 | 1 |
Tabela 5.9.11: Contagem de dados
$$\text{Median} = 8.5$$
A probabilidade de falha acima do limite superior de especificação: $$\text{Failure Prob} = \frac{#[\text{Measure} > LSE]}{N} = \frac{1}{20} = 0.05$$
O PPM esperado correspondente a valores fora dos limites de especificação é dado por:
$$(\text{PPM}_\text{esp} > LSE) = 10^6 \times \text{Failure Prob} = 50,000$$
O cálculo do Ppk pode ser expresso por:
$$\text{Ppk} = \frac{\Phi^{-1}(1 - 0.05)}{3} = 0.5483$$