3.3 Process Capacity/Performance and Standardized Normal Distribution (Z)
Let’s explore data normality and process capability indices to calculate the probabilities of out-of-spec parts. In this way, we take
- Unilateral Specifications:
$$Z_{LSE} = \dfrac{LSE - \mu}{\sigma} \qquad \hbox{ou} \qquad Z_{LIE} = \dfrac{\mu - LIE}{\sigma}$$
Figure 3.3.1: Upper and Lower Unilateral Specification
- Bilateral Specifications:
$$Z_{min} = \min \lbrace Z_{LSE}; ~Z_{LIE} \rbrace $$
Figure 3.3.2: Bilateral Specification
When the process is under statistical control and is normally distributed, the values of $Z$ can be used to estimate the proportion of defective (or, out of specifications). This proportion can be transformed into a defect rate in parts per million by simply multiplying it by one million (PPM). Furthermore, the expression of $C_{pk}$ can be expressed in terms of Z, by
$$C_{pk} = \dfrac{Z_{min}}{3}$$
| $Z_{min}$ | $Cpk$ | $PPM$ |
|---|---|---|
| 3 | 1 | 2700 |
| 4 | 1,33 | 63 |
| 5 | 1,67 | 0,57 |
| 6 | 2 | 0,002 |
Table 3.3.1: Values of $Z_{min}$ and $Cpk$
Index $C_{pm}$
To adequately address the process location problem, Taguchi proposed the use of the following index
$$C_{pm} = \dfrac{LSE - LIE}{6\sqrt{(\mu - T)^{2}+\sigma^{2}}}$$
where T corresponds to the nominal value of the process (target). Through this definition, we observe that
-
much importance is given to the target $(T)$;
-
little importance is given to specification limits;
-
variation is expressed in two components, the process variation ($\sigma$) and the variation around the target $(μ - T)$.
Applications
Example 3.1
The following table presents data on the whiteness level of a material sent for analysis. In this example we will evaluate the capacity and performance of the process.
We have the following specifications: LIE = 125 and LSE = 135.
| n | Measure |
|---|---|
| 1 | 126,54 |
| 2 | 126,64 |
| 3 | 127,03 |
| 4 | 126,66 |
| 5 | 130,01 |
| 6 | 126,8 |
| 7 | 128,74 |
| 8 | 129,2 |
| 9 | 128,34 |
| 10 | 128,27 |
| 11 | 128,94 |
| 12 | 128,96 |
| 13 | 130,78 |
| 14 | 131,89 |
| 15 | 131,17 |
| 16 | 130,57 |
| 17 | 129,02 |
| 18 | 127,55 |
| 19 | 127,59 |
| 20 | 127,11 |
| 21 | 129,55 |
| 22 | 130,35 |
| 23 | 129,4 |
| 24 | 127,08 |
| 25 | 129,31 |
Table 3.3.2: Degree of whiteness of a material.
Firstly, we will analyze the stability of the process using a control chart.
Figure 3.3.3: I-MR Charts
We check on the moving range graph that all values are within the control limits. However, in the graph of individual values we have a point more than 3 standard deviations from the central line, which may indicate the presence of a special cause of variation in the process.
Next, we will check whether the data has a normal distribution. For this we will use the Anderson-Darling test.
| Statistics | P-values | |
|---|---|---|
| Anderson - Darling | 0.3906 | 0.3554 |
Table 3.3.3: Normality test result
Figure 3.3.4: Probability role
As the p-value associated with the Anderson-Darling test is greater than 0.05, we do not reject the hypothesis that the data has an approximately normal distribution.
With this, we can analyze the capacity and performance of the process.
So, for the long-term variability method we have
$$\widehat{\sigma} = s = \sqrt{\dfrac{\sum_{i=1}^{n}(x_i - \overline{x})^2}{n - 1}} = 1,555822$$
and with that,
$$P_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{135 - 125}{6 \ast (1,555822)} = 1,071245$$
$$P_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace = \min\left \lbrace \dfrac{135 - 128,7}{3 \ast (1,555822)}~;~\dfrac{128,7 - 125}{3 \ast (1,555822) }\right \rbrace $$
$$P_{pk} = \min \lbrace 1,349769;~0,792721 \rbrace = 0,792721$$
Calculating the value of Z, we obtain
$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{135 - 128,7}{1,555822} = 4,049306$$
$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE }{\widehat{\sigma}} = \dfrac{128,7 - 125}{1,555822} = 2,378164$$
Calculating the $PPM_{Total}$
$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(4,049306)] 1.000.000 = 25,68487$$
$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-2,378164) 1.000.000 = 8699,54282$$
So,
$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 25,68487 + 8699,54282 = 8725,228$$
For the short-term variability method, we have
$$\widehat{\sigma} = \dfrac{\overline{R}}{d_2} = \dfrac{1,165022}{1,128} = 1,032820974$$
being $d_{2}$ = 1.128 (for n = 2) tabulated in the Appendix and
$$\overline{R} = \dfrac{\sum_{i=2}^{25}\mid (x_i - x_{i-1}) \mid}{n - 1} = 1,165022$$
With this, we can calculate the Process Capability indexes, given by
$$C_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{135 - 125}{6 \ast (1,032820974)} = 1,613703$$
$$C_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace $$
$$C_{pk} = \min\left \lbrace \dfrac{135 - 128,7}{3 \ast (1,032820974)}~;~\dfrac{128,7 - 125}{3 \ast (1,032820974)} \right \rbrace $$
$$C_{pk} = \min \lbrace 2,033266~;~1,194140 \rbrace = 1,194140$$
The Z value is obtained as follows
$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{135 - 128,7}{1,032820974} = 6,099799$$
$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE}{\widehat{\sigma}} = \dfrac{128,7 - 125}{1,032820974} = 3,582421$$
So, to find the $PPM_{Total}$ we calculate
$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(6,099799)] 1.000.000 = 0$$
$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-3,582421) 1.000.000 = 170,21229$$
Then,
$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 0 + 170,21229 = 170,21229$$
Below are the results of the process performance analysis obtained by Software Action for this example.
| Value | |
|---|---|
| Sample: | 25 |
| Lower Limit | 125 |
| Upper Limit | 135 |
Table 3.3.4: Specifications
| Estimate | |
|---|---|
| Average | 128.7 |
| Standard Deviation (Short term) | 1.0328 |
| Standard Deviation (Long term) | 1.5558 |
Table 3.3.5: Estimates
| Performance Indexes (Total Variability) | |
|---|---|
| PP | 1.0712 |
| PPI | 0.7927 |
| PPS | 1.3498 |
| PPK | 0.7927 |
Table 3.3.6: Performance Indices (Long term)
| Capacity Indices (Inherent Variability) | |
|---|---|
| CP | 1.6137 |
| CPI | 1.1941 |
| CPS | 2.0333 |
| CPK | 1.1941 |
Table 3.3.7: Capacity Indexes (Short term)
| Observed Indices | |
|---|---|
| PPM < LIE | 0 |
| PPM > LSE | 0 |
| Total PPM | 0 |
Table 3.3.8: Observed Indexes
| Expected Indices (Total Variability) | |
|---|---|
| PPM < LIE | 8699.5552 |
| PPM > LSE | 25.6849 |
| Total PPM | 8725.2401 |
Table 3.3.9: Expected Indices (Long term)
| Expected Indices (Inherent Variability) | |
|---|---|
| PPM < LIE | 170.2163 |
| PPM > LSE | 0.0005 |
| Total PPM | 170.2168 |
Table 3.3.10: Expected Indices (Short term)
Figure 3.3.5: Process performance analysis graph.
With this, we can conclude that as the process is not under control, that is, it is an unstable process, its capacity does not reflect reality. In this case, performance indices indicate the actual behavior of the process and capacity indices indicate the behavior of the process if it is stabilized.
Example 3.2
Let us consider the data in the following table referring to the measurements of a part sent for analysis. The specification limits for this part are: $LSE = 324$, $VN = 270$ (nominal value) and $LIE = 216$. We will evaluate the capacity and performance of the process.
| Data collection | |||||
|---|---|---|---|---|---|
| Sample | Date | X1 | X2 | X3 | X4 |
| 1 | 13-11-06 | 307,00 | 317,40 | 303,20 | 307,70 |
| 2 | 20-11-06 | 260,40 | 259,60 | 270,50 | 244,50 |
| 3 | 20-11-06 | 261,40 | 275,80 | 257,90 | 263,90 |
| 4 | 27-11-06 | 274,50 | 280,30 | 278,00 | 263,20 |
| 5 | 27-11-06 | 254,90 | 266,40 | 275,50 | 228,90 |
| 6 | 27-11-06 | 251,30 | 257,10 | 253,40 | 248,60 |
| 7 | 27-11-06 | 269,60 | 278,80 | 286,00 | 267,70 |
| 8 | 04-12-06 | 281,80 | 274,30 | 263,20 | 251,60 |
| 9 | 04-12-06 | 281,60 | 284,10 | 303,00 | 290,40 |
| 10 | 04-12-06 | 301,50 | 303,30 | 285,60 | 280,70 |
| 11 | 11-12-06 | 308,30 | 292,40 | 309,00 | 297,70 |
| 12 | 11-12-06 | 283,60 | 284,30 | 255,40 | 258,40 |
| 13 | 11-12-06 | 305,80 | 299,50 | 296,40 | 295,60 |
| 14 | 18-12-06 | 239,50 | 252,60 | 218,90 | 271,20 |
| 15 | 15-01-07 | 291,10 | 299,20 | 300,40 | 315,10 |
| 16 | 15-01-07 | 283,10 | 280,30 | 284,80 | 280,80 |
| 17 | 22-01-07 | 276,00 | 271,00 | 264,90 | 242,00 |
| 18 | 22-01-07 | 248,10 | 267,70 | 266,70 | 272,20 |
| 19 | 29-01-00 | 245,40 | 250,60 | 260,00 | 296,30 |
| 20 | 29-01-07 | 307,70 | 288,90 | 281,80 | 290,40 |
| 21 | 03-02-07 | 246,30 | 240,70 | 258,80 | 240,50 |
| 22 | 03-02-07 | 231,00 | 255,90 | 249,80 | 223,60 |
| 23 | 03-02-07 | 257,10 | 239,50 | 257,90 | 272,20 |
| 24 | 12-02-07 | 266,10 | 284,70 | 281,50 | 289,80 |
| 25 | 17-02-07 | 279,10 | 278,40 | 247,40 | 286,10 |
Table 3.3.11: Part - Right wheel LO - Mercedes-Benz.
Firstly, we will analyze the stability of the process using a control chart.
Figure 3.3.6: Graph $\overline{X}$ and R.
We check on the moving range graph that all values are within the control limits. However, in the graph of $\overline{X}$ indicates the presence of special causes, which leave the process unstable.
Next, we will check whether the data has a normal distribution. For this we will use the Anderson-Darling test.
Figure 3.3.7: Probability role and result of the Normality test.
As the p-value associated with the Anderson-Darling test (0.6) is greater than 0.05, we do not reject the hypothesis that the data has an approximately normal distribution.
With this, we can analyze the capacity and performance of the process.
So, for the long-term variability method we have
$$\widehat{\sigma} = s = \sqrt{\dfrac{\sum_{i=1}^{n}(x_i - \overline{x})^2}{n - 1}} = 21,879$$
and with that,
$$P_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{324 - 216}{6 \ast (21,879)} = 0,8227$$
$$P_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace = \min\left \lbrace \dfrac{324 - 272,84}{3 \ast (21,879)}~;~\dfrac{272,84 - 216}{3 \ast (21,879)} \right \rbrace $$
$$P_{pk} = \min \lbrace (0,7794;~0,866) \rbrace = 0,7794$$
Calculating the value of Z, we obtain
$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{324 - 272,84}{21,879} = 2,3383$$
$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE }{\widehat{\sigma}} = \dfrac{272,84 - 216}{21,879} = 2,5979$$
Calculating the $PPM_{Total}$
$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(2,3383)] 1.000.000 = 9685,846$$
$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-2,5979) 1.000.000 = 4689,79$$
So,
$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 9685,846 + 4689,79 = 14375,64$$
For the short-term variability method, we have
$$\widehat{\sigma} = \dfrac{\overline{R}}{d_2} = \dfrac{25,6}{2,326} = 12,4328$$
being $d_{2}$ = 2.326 (for n = 5) tabulated in the Appendix.
With this, we can calculate the Process Capability indexes, given by
$$C_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{324 - 216}{6 \ast (12,4328)} = 1,4478$$
$$C_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace $$
$$C_{pk} = \min\left \lbrace \dfrac{324 - 272,84}{3 \ast (12,4328)}~;~\dfrac{272,84 - 216}{3 \ast (12,4328)} \right \rbrace $$
$$C_{pk} = \min \lbrace 1,3716;~1,5239 \rbrace = 1,3716$$
The Z value is obtained as follows
$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{324 - 272,84}{12,4328} = 4,1149$$
$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE}{\widehat{\sigma}} = \dfrac{272,84 - 216}{12,4328} = 4,5718$$
So, to find the $PPM_{Total}$ we calculate
$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(4,1149)] 1.000.000 = 19,3674$$
$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-4,5718) 1.000.000 = 2,4178$$
Then,
$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 19,3674 + 2,4178 = 21,7851$$
Below are the results obtained by Software Action for this example.
| Value | |
|---|---|
| Sample: | 100 |
| Lower Limit | 216 |
| Upper Limit | 324 |
Table 3.3.12: Specifications
| Estimate | |
|---|---|
| Average | 272.841 |
| Standard Deviation (Short term) | 12.4328 |
| Standard Deviation (Long term) | 21.8792 |
Table 3.3.13: Estimates
| Performance Indexes (Total Variability) | |
|---|---|
| PP | 0.8227 |
| PPI | 0.866 |
| PPS | 0.7794 |
| PPK | 0.7794 |
Table 3.3.14: Performance Indices (Long term)
| Capacity Indices (Inherent Variability) | |
|---|---|
| CP | 1.4478 |
| CPI | 1.524 |
| CPS | 1.3716 |
| CPK | 1.3716 |
Table 3.3.15: Capacity Indexes (Short term)
| Observed Indices | |
|---|---|
| PPM < LIE | 0 |
| PPM > LSE | 0 |
| Total PPM | 0 |
Table 3.3.16: Observed Indexes
| Expected Indices (Total Variability) | |
|---|---|
| PPM < LIE | 4689.2178 |
| PPM > LSE | 9687.3046 |
| Total PPM | 14376.5224 |
Table 3.3.17: Expected Indices (Long term)
| Expected Indices (Inherent Variability) | |
|---|---|
| PPM < LIE | 2.417 |
| PPM > LSE | 19.3719 |
| Total PPM | 21.789 |
Table 3.3.18: Expected Indices (Short term)
Figure 3.3.8: Process performance analysis graph.
We conclude that this is an unstable process, which justifies the difference between the indices $C_{p}$ and $P_{p}$. In this case, performance indices indicate the actual behavior of the process and capacity indices indicate the behavior of the process if it is stabilized. Therefore, observing the performance indexes we see that the process does not meet the specifications regarding variability (index $P_{p}$ low).