Capability Analysis 4 of 11

Capability Analysis

3.3 Process Capacity/Performance and Standardized Normal Distribution (Z)

Chapter 3 of 10 9 min read

Let’s explore data normality and process capability indices to calculate the probabilities of out-of-spec parts. In this way, we take

  • Unilateral Specifications:

$$Z_{LSE} = \dfrac{LSE - \mu}{\sigma} \qquad \hbox{ou} \qquad Z_{LIE} = \dfrac{\mu - LIE}{\sigma}$$

Figura 3.3.1

Figure 3.3.1: Upper and Lower Unilateral Specification

  • Bilateral Specifications:

$$Z_{min} = \min \lbrace Z_{LSE}; ~Z_{LIE} \rbrace $$

Figura 3.3.2

Figure 3.3.2: Bilateral Specification

When the process is under statistical control and is normally distributed, the values of $Z$ can be used to estimate the proportion of defective (or, out of specifications). This proportion can be transformed into a defect rate in parts per million by simply multiplying it by one million (PPM). Furthermore, the expression of $C_{pk}$ can be expressed in terms of Z, by

$$C_{pk} = \dfrac{Z_{min}}{3}$$

$Z_{min}$ $Cpk$ $PPM$
3 1 2700
4 1,33 63
5 1,67 0,57
6 2 0,002

Table 3.3.1: Values of $Z_{min}$ and $Cpk$

Index $C_{pm}$

To adequately address the process location problem, Taguchi proposed the use of the following index

$$C_{pm} = \dfrac{LSE - LIE}{6\sqrt{(\mu - T)^{2}+\sigma^{2}}}$$

where T corresponds to the nominal value of the process (target). Through this definition, we observe that

  • much importance is given to the target $(T)$;

  • little importance is given to specification limits;

  • variation is expressed in two components, the process variation ($\sigma$) and the variation around the target $(μ - T)$.

Applications

Example 3.1

The following table presents data on the whiteness level of a material sent for analysis. In this example we will evaluate the capacity and performance of the process.

We have the following specifications: LIE = 125 and LSE = 135.

n Measure
1 126,54
2 126,64
3 127,03
4 126,66
5 130,01
6 126,8
7 128,74
8 129,2
9 128,34
10 128,27
11 128,94
12 128,96
13 130,78
14 131,89
15 131,17
16 130,57
17 129,02
18 127,55
19 127,59
20 127,11
21 129,55
22 130,35
23 129,4
24 127,08
25 129,31

Table 3.3.2: Degree of whiteness of a material.

Firstly, we will analyze the stability of the process using a control chart.

Figura 3.3.3

Figure 3.3.3: I-MR Charts

We check on the moving range graph that all values are within the control limits. However, in the graph of individual values ​​we have a point more than 3 standard deviations from the central line, which may indicate the presence of a special cause of variation in the process.

Next, we will check whether the data has a normal distribution. For this we will use the Anderson-Darling test.

Statistics P-values
Anderson - Darling 0.3906 0.3554

Table 3.3.3: Normality test result

Figura 3.3.4

Figure 3.3.4: Probability role

As the p-value associated with the Anderson-Darling test is greater than 0.05, we do not reject the hypothesis that the data has an approximately normal distribution.

With this, we can analyze the capacity and performance of the process.

So, for the long-term variability method we have

$$\widehat{\sigma} = s = \sqrt{\dfrac{\sum_{i=1}^{n}(x_i - \overline{x})^2}{n - 1}} = 1,555822$$

and with that,

$$P_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{135 - 125}{6 \ast (1,555822)} = 1,071245$$

$$P_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace = \min\left \lbrace \dfrac{135 - 128,7}{3 \ast (1,555822)}~;~\dfrac{128,7 - 125}{3 \ast (1,555822) }\right \rbrace $$

$$P_{pk} = \min \lbrace 1,349769;~0,792721 \rbrace = 0,792721$$

Calculating the value of Z, we obtain

$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{135 - 128,7}{1,555822} = 4,049306$$

$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE }{\widehat{\sigma}} = \dfrac{128,7 - 125}{1,555822} = 2,378164$$

Calculating the $PPM_{Total}$

$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(4,049306)] 1.000.000 = 25,68487$$

$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-2,378164) 1.000.000 = 8699,54282$$

So,

$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 25,68487 + 8699,54282 = 8725,228$$

For the short-term variability method, we have

$$\widehat{\sigma} = \dfrac{\overline{R}}{d_2} = \dfrac{1,165022}{1,128} = 1,032820974$$

being $d_{2}$ = 1.128 (for n = 2) tabulated in the Appendix and

$$\overline{R} = \dfrac{\sum_{i=2}^{25}\mid (x_i - x_{i-1}) \mid}{n - 1} = 1,165022$$

With this, we can calculate the Process Capability indexes, given by

$$C_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{135 - 125}{6 \ast (1,032820974)} = 1,613703$$

$$C_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace $$

$$C_{pk} = \min\left \lbrace \dfrac{135 - 128,7}{3 \ast (1,032820974)}~;~\dfrac{128,7 - 125}{3 \ast (1,032820974)} \right \rbrace $$

$$C_{pk} = \min \lbrace 2,033266~;~1,194140 \rbrace = 1,194140$$

The Z value is obtained as follows

$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{135 - 128,7}{1,032820974} = 6,099799$$

$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE}{\widehat{\sigma}} = \dfrac{128,7 - 125}{1,032820974} = 3,582421$$

So, to find the $PPM_{Total}$ we calculate

$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(6,099799)] 1.000.000 = 0$$

$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-3,582421) 1.000.000 = 170,21229$$

Then,

$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 0 + 170,21229 = 170,21229$$

Below are the results of the process performance analysis obtained by Software Action for this example.

Value
Sample: 25
Lower Limit 125
Upper Limit 135

Table 3.3.4: Specifications

Estimate
Average 128.7
Standard Deviation (Short term) 1.0328
Standard Deviation (Long term) 1.5558

Table 3.3.5: Estimates

Performance Indexes (Total Variability)
PP 1.0712
PPI 0.7927
PPS 1.3498
PPK 0.7927

Table 3.3.6: Performance Indices (Long term)

Capacity Indices (Inherent Variability)
CP 1.6137
CPI 1.1941
CPS 2.0333
CPK 1.1941

Table 3.3.7: Capacity Indexes (Short term)

Observed Indices
PPM < LIE 0
PPM > LSE 0
Total PPM 0

Table 3.3.8: Observed Indexes

Expected Indices (Total Variability)
PPM < LIE 8699.5552
PPM > LSE 25.6849
Total PPM 8725.2401

Table 3.3.9: Expected Indices (Long term)

Expected Indices (Inherent Variability)
PPM < LIE 170.2163
PPM > LSE 0.0005
Total PPM 170.2168

Table 3.3.10: Expected Indices (Short term)

Figura 3.3.5

Figure 3.3.5: Process performance analysis graph.

With this, we can conclude that as the process is not under control, that is, it is an unstable process, its capacity does not reflect reality. In this case, performance indices indicate the actual behavior of the process and capacity indices indicate the behavior of the process if it is stabilized.

Example 3.2

Let us consider the data in the following table referring to the measurements of a part sent for analysis. The specification limits for this part are: $LSE = 324$, $VN = 270$ (nominal value) and $LIE = 216$. We will evaluate the capacity and performance of the process.

Data collection
Sample Date X1 X2 X3 X4
1 13-11-06 307,00 317,40 303,20 307,70
2 20-11-06 260,40 259,60 270,50 244,50
3 20-11-06 261,40 275,80 257,90 263,90
4 27-11-06 274,50 280,30 278,00 263,20
5 27-11-06 254,90 266,40 275,50 228,90
6 27-11-06 251,30 257,10 253,40 248,60
7 27-11-06 269,60 278,80 286,00 267,70
8 04-12-06 281,80 274,30 263,20 251,60
9 04-12-06 281,60 284,10 303,00 290,40
10 04-12-06 301,50 303,30 285,60 280,70
11 11-12-06 308,30 292,40 309,00 297,70
12 11-12-06 283,60 284,30 255,40 258,40
13 11-12-06 305,80 299,50 296,40 295,60
14 18-12-06 239,50 252,60 218,90 271,20
15 15-01-07 291,10 299,20 300,40 315,10
16 15-01-07 283,10 280,30 284,80 280,80
17 22-01-07 276,00 271,00 264,90 242,00
18 22-01-07 248,10 267,70 266,70 272,20
19 29-01-00 245,40 250,60 260,00 296,30
20 29-01-07 307,70 288,90 281,80 290,40
21 03-02-07 246,30 240,70 258,80 240,50
22 03-02-07 231,00 255,90 249,80 223,60
23 03-02-07 257,10 239,50 257,90 272,20
24 12-02-07 266,10 284,70 281,50 289,80
25 17-02-07 279,10 278,40 247,40 286,10

Table 3.3.11: Part - Right wheel LO - Mercedes-Benz.

Firstly, we will analyze the stability of the process using a control chart.

Figura 3.3.6

Figure 3.3.6: Graph $\overline{X}$ and R.

We check on the moving range graph that all values are within the control limits. However, in the graph of $\overline{X}$ indicates the presence of special causes, which leave the process unstable.

Next, we will check whether the data has a normal distribution. For this we will use the Anderson-Darling test.

Figura 3.3.7

Figure 3.3.7: Probability role and result of the Normality test.

As the p-value associated with the Anderson-Darling test (0.6) is greater than 0.05, we do not reject the hypothesis that the data has an approximately normal distribution.

With this, we can analyze the capacity and performance of the process.

So, for the long-term variability method we have

$$\widehat{\sigma} = s = \sqrt{\dfrac{\sum_{i=1}^{n}(x_i - \overline{x})^2}{n - 1}} = 21,879$$

and with that,

$$P_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{324 - 216}{6 \ast (21,879)} = 0,8227$$

$$P_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace = \min\left \lbrace \dfrac{324 - 272,84}{3 \ast (21,879)}~;~\dfrac{272,84 - 216}{3 \ast (21,879)} \right \rbrace $$

$$P_{pk} = \min \lbrace (0,7794;~0,866) \rbrace = 0,7794$$

Calculating the value of Z, we obtain

$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{324 - 272,84}{21,879} = 2,3383$$

$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE }{\widehat{\sigma}} = \dfrac{272,84 - 216}{21,879} = 2,5979$$

Calculating the $PPM_{Total}$

$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(2,3383)] 1.000.000 = 9685,846$$

$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-2,5979) 1.000.000 = 4689,79$$

So,

$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 9685,846 + 4689,79 = 14375,64$$

For the short-term variability method, we have

$$\widehat{\sigma} = \dfrac{\overline{R}}{d_2} = \dfrac{25,6}{2,326} = 12,4328$$

being $d_{2}$ = 2.326 (for n = 5) tabulated in the Appendix.

With this, we can calculate the Process Capability indexes, given by

$$C_p = \dfrac{LSE - LIE}{6\widehat{\sigma}} = \dfrac{324 - 216}{6 \ast (12,4328)} = 1,4478$$

$$C_{pk} = \min\left \lbrace \dfrac{LSE - \widehat{\mu}}{3\widehat{\sigma}}~;~\dfrac{\widehat{\mu} - LIE}{3\widehat{\sigma}} \right \rbrace $$

$$C_{pk} = \min\left \lbrace \dfrac{324 - 272,84}{3 \ast (12,4328)}~;~\dfrac{272,84 - 216}{3 \ast (12,4328)} \right \rbrace $$

$$C_{pk} = \min \lbrace 1,3716;~1,5239 \rbrace = 1,3716$$

The Z value is obtained as follows

$$Z_{LSE} = \dfrac{LSE - \widehat{\mu}}{\widehat{\sigma}} = \dfrac{324 - 272,84}{12,4328} = 4,1149$$

$$Z_{LIE} = \dfrac{\widehat{\mu} - LIE}{\widehat{\sigma}} = \dfrac{272,84 - 216}{12,4328} = 4,5718$$

So, to find the $PPM_{Total}$ we calculate

$$PPM_{LSE} = [1 - \Phi(Z_{LSE})] 1.000.000 = [1 - \Phi(4,1149)] 1.000.000 = 19,3674$$

$$PPM_{LIE} = \Phi(Z_{LIE}) 1.000.000 = \Phi(-4,5718) 1.000.000 = 2,4178$$

Then,

$$PPM_{Total} = PPM_{LSE} + PPM_{LIE} = 19,3674 + 2,4178 = 21,7851$$

Below are the results obtained by Software Action for this example.

Value
Sample: 100
Lower Limit 216
Upper Limit 324

Table 3.3.12: Specifications

Estimate
Average 272.841
Standard Deviation (Short term) 12.4328
Standard Deviation (Long term) 21.8792

Table 3.3.13: Estimates

Performance Indexes (Total Variability)
PP 0.8227
PPI 0.866
PPS 0.7794
PPK 0.7794

Table 3.3.14: Performance Indices (Long term)

Capacity Indices (Inherent Variability)
CP 1.4478
CPI 1.524
CPS 1.3716
CPK 1.3716

Table 3.3.15: Capacity Indexes (Short term)

Observed Indices
PPM < LIE 0
PPM > LSE 0
Total PPM 0

Table 3.3.16: Observed Indexes

Expected Indices (Total Variability)
PPM < LIE 4689.2178
PPM > LSE 9687.3046
Total PPM 14376.5224

Table 3.3.17: Expected Indices (Long term)

Expected Indices (Inherent Variability)
PPM < LIE 2.417
PPM > LSE 19.3719
Total PPM 21.789

Table 3.3.18: Expected Indices (Short term)

Figura 3.3.8

Figure 3.3.8: Process performance analysis graph.

We conclude that this is an unstable process, which justifies the difference between the indices $C_{p}$ and $P_{p}$. In this case, performance indices indicate the actual behavior of the process and capacity indices indicate the behavior of the process if it is stabilized. Therefore, observing the performance indexes we see that the process does not meet the specifications regarding variability (index $P_{p}$ low).

↑